Planing Engineer, DDT Konstract Inc., Building Construction

START Date: 
May, 2003

 

Planning Engineer May 2012- Present-DDT Konstract Inc. (DDTKI)-Unit 401 4th Floor,Lancaster Hotel, #622Shaw Boulevard,

Mandaluyong City, Philippines, -BDO CORPORATE CENTER PROJECT-(ARPIL 10, 2012-FEB 24, 2015) –ON-GOING

 (49 Storey Office Building with (6) basements ADB Avenue, Ortigas Center, Pasig City), -MANILA BAY RESORT PROJECT-    ( NOVEMBER 17, 2012-MAY 31, 2013)PHASE 1 (JANUARY 16, 2013- MAY 27, 2014)PHASE 2 –ON-GOING

TIGER RESORTS, LEISURE AND ENTERTAINMENT, INC.-Atlantic Drive, Brgys. Tambo and Don Galo, Paranaque City.

 -Updating, Materials monitoring, Making cash flow, S-curves, Pert Cpm, Computing Advance/Delays of a project and Procurement Schedule

Hilmarcs Construction Corporation (HCC)-Alphaland Tower project

Malugay Street, Makati City, Philippines

January 2012- May 2012

 

Project Manager

Ø  Subcontractor Formworks

 

JASV BUILDERS

Unit 5 Corporate Building, Boni Serrano Ave. Q.C, Philippines

(July 2011 – February 2012)

 

HORSESHOE TOWNHOUSE PROJECT

Project Supervisor

Ø  Responsible for the management of assigned projects.

Ø  Performs inspection and test of install system

Ø  Provide direct supervision of assigned projects.

Ø  Responsible and custodian for all fixed assets and cash generated in projects.

Ø  Assigned and scheduling of duties of personnel with the approval of CEO.

Ø  Monitoring and prevention of materials shrinkage.

Ø  Interface of projects operation on all function.

Ø  Performs construction estimates

Ø  Provides documents in change order and additional works

Ø  Provides as built plans cause by change order and additional works

Ø  Maintenance of site which includes security, cleanliness, orderliness and disciplined to all personnel. 

 

 

UNICADD Tech. Philippines / SRDP Consulting Inc.

130 B – Unit 119 SJB Condominium Panay Ave. Brgy. South Triangle, Quezon City, Phil.

(July 2007 – July 2011)

 

Versar International Assitances Projects

HercoCenter, Buenavidez St., Makati City

-VIAP provides on-site technical inspection, supervision and assessment of projects, assessment and verification of contractor Quality Control systems, inspection and monitoring for construction quality and contract compliance.-VIAP’s key management staff is comprised of highly experienced construction professionals, with experience delivering projects in every part of the world. From projects in the frozen polar regions, to the tough conditions in the middle east, to equatorial Africa, VIAP’s construction management professionals are well-suited to managing your projects in the toughest locales. Construction and engineering services are vital to the successful transition to peace in conflict and post-conflict areas. Nowhere else can construction be quite as challenging as these areas. From jobsite security, personal security, to communications and transportation, VIAP’s staff and operations are trained, experienced, and equipped to ensure quality project delivery in the highest threat and most hostile areas.

 

“Quality Assurance Engineer”– Responsible for planning and executing all quality-related action of the project and ensuring they are performed properly according to pre-defined processes.

 

Ø  Studies and analyzes client specifications and requirements; evaluates the quality output of the file based on the process flow of any given project; recommends actions or procedures on non-conformances found that ensure accuracy requirements are met.

 

Ø  Monitors and evaluates agents based on client specifications and international standards.

            1.Statement of Requirements (SOR)

            2.Statement of Work (SOW)

            3.Approved Assessment

            4. International Building Code (IBC)

5.American Concrete Institute (ACI)

6. American Association State Highway and

Transportation Officials (AASHTO)

7.American Society for Testing and Materials (ASTM)

7. National Electrical Code 2005 (NEC)

8. American National Standard Institute (ANSI)

9. International Plumbing Code (IPC)

10. International Mechanical Code (IMC)

Ø  Ensures that contractors are not relieved from their responsibility of providing accurate submittals, for conformity to of the same to the requirements of the Contract Documents, for compatibility of described product with other provided       products and the rest of the system, or for prosecution and completion of the Contract in accordance with the Contract Documents