Market Place
Top Posters
Rafael Davila
5,240 posts
Mike Testro
4,418 posts
Zoltan Palffy
3,089 posts
Vladimir Liberzon
2,751 posts
Rodel Marasigan
1,699 posts
Samer Zawaydeh
1,664 posts
Anoon Iimos
1,422 posts
Alexandre Faulx-B...
1,355 posts
Dieter Wambach
1,350 posts
Charleston-Joseph...
1,347 posts
Contact Us
Email: PPadmin@planningplanet.com
User login
PP Wiki
- Schedule Construction
- Activity Codes
- Activity Durations
- Rates, Norms & Durations
- Automotive
- Bridges
- Building & Construction
- Building Services / E&M
- Defence Sector
- Fitout & Finishes
- Health & Healthcare
- IT Engineering Projects
- Petrochemical Oil & Gas
- Pharmaceutical
- Power Generation & Nuclear
- Roads & Infrastructure
- Rule of Thumb
- Shipbuilding
- Transportation
- Tunnelling & Mining
- Water Management
- Rates, Norms & Durations
- Budget & Cost Loading
- CBS Codes
- Calendars
- Constraints
- Crew size and mix
- EPS Codes
- Estimating
- Hammock Tasks
- Implementing Schedules
- Logic, Leads & Lags
- Network Rules
- OBS Codes
- OBS and EPS in Primavera P6
- How Lean Construction Principles and Critical Path Methods Enhance One Another
- Programme Narrative
- Resource Loading
- Resource Levelling
- Schedule Levels
- WBS Codes
- WBS Structure
Popular Content
Baseline Schedule
BIM
blog
CPM
CPM scheduling
Earned Value
earned value management
events
EVM
home
Microsoft Project
P6
Planning
Planning and Scheduling
poliwęglan lity
primavera
Primavera P6
project controls
project management
risk
risk-based management
risk management
risk register
schedule
scheduling
site
software
wbs
www
Partners & Sponsors
Have your logo here?
Contact us
Comments
Asian Pakistan
Kindly send productivity rates of asia also, and mention more activitiese
Productivity rate in Gulf region
For your requirement lads,
Production (Man Power) rates in Gulf Area
Hi All,
Could anyone please send me production (man power) rates for gulf area especially in construction
eng_amrelsaied@hotmail.com
Regards,
Sprinkler outputs
Hello all
Im new to this platform but am looking for some output rates for sprinkler installations in the UK. any and all help will be apprecieated
MEP Productivity
Metsec output rates
Hi, Has anyone got any information of Metsec output rates please
MEP PRODUCTIVITY rate reference
MEP productivity rate norms::
Does anyone know where to get the Productivity rate of MEP work that trust worthy and can be used as reference to support the duration calculation.
greatly appreciate,
pisan_osk@hotmail.com
Manual Rates
Hi,
It seems that the most of the rates here are equipment rates. do you have any rates for manpowered activities (e.g. manual excavation)
Productivity rates for "Civil Infra. and Oil & Gas Projcts
Dear Friends,
I need the productivity rates for "Civil Infrastructure and Oil & Gas Projcts" of Middle East Countries. Any one can help ? Please send the excel/word sheet to my e-mail id:
ramanannagamani@gmail.com
Thanks.
Ramanan
Drainage outputs
looking at the drainage outputs on here they don't seem to be that reliable? does anybody have an excel spreadsheet they would be able to send with some general drainage outputs?
ManPower Productivity Norms for MEP
hi,
Anyone having Manpower productivy norms excel file for MEP(Gulf), it will be very helful to me.
e-mail: hariveerendra@gmail.com
Drainage outputs
I am struggling to see any logic behind the productions per hour on the drainage?
33m per hour for 150mm drainage in runs exceeding 30m or greater is impossible - unless installed via trenchless methods!
I calculate my drainage productions to include dig, bed and surround, pipe laying and backfilling compacting in accordance with the specification and would never price on more than 30 - 35m per DAY for a 150mm UPVC pipe at a depth not exceeding 1m.
What do the productions on here realte to and what do they include?
Contact JEPM LLC at 409-457-7725
What geographical location is labor being executed? (remote/local port)
What is the weather conditions?
What type of industry?
Other particulars or need; Are there readily available resource (MP & DFL Equip/Consumables) ?
Please feel free to contact me at your convenience.
Once we come into mutual agreement, I will produce the needed excel loaded unit rates for your project/s need/s. Based on execution industry actuals.
Best regard,
JEPM LLC
Project Controls Engineer SME
Jacob Armstrong
409-457-7725
Project Controls SME
Are you in need still?
Jaocb Armstrong JEPM LLC 409-457-7725
Ya, I am waiting for
Ya, I am waiting for comments. If you can give some feedback/ comments, it will greatly be useful.
Thanks/Regards,
Santhosh
Impact of crew size and composition on productivity
Ya, I am waiting for comments. If you can give some feedback/ comments, it will greatly be useful.
Thanks/Regards,
Santhosh
Project Controls SME
Are you in need still?
Jaocb Armstrong JEPM LLC 409-457-7725
Impact of crew design (crew size and composition)on productivity
Hi all,
Can you comment on impact of crew design, i.e crew size and composition on productivity?
Thanks,
Santhosh
Construction labour rates
Dear all experts;
This data is very useful for me and thank you all. But i need construction labour rates as an excel file. If somebody has it and sen me i will very be thankful. Also can you please give a book advise for this issue.
Thank you all.
efe.gurkan@hotmail.com
productivity rates
Dear all experts,
I need the productivity rates for Oil & Gas Project - Construction Trade like Sand Blaster, Fireproofer, Spray Painter, Scaffolder, Sheet Metal Fitter, Insulators and Welder.
I will be very thankful if excel file or PDF file of all production rates can be shared on my email address: sukh_shrestha@hotmail.com
Thank You
Productivity
Crew structure
Thank you deeply, for the great effort you've been doing.
I just would like to pay your attention that the productivity rates are in a big need to the crew structure producing these rates.
Best Regards,
Crew structure
Thank you deeply, for the great effort you've been doing.
I just would like to pay your attention that the productivity rates are in a big need to the crew structure producing these rates.
Best Regards,
Crew structure
Thank you deeply, for the great effort you've been doing.
I just would like to pay your attention that the productivity rates are in a big need to the crew structure producing these rates.
Best Regards,
Pluming Productivity rates
Dear all experts,
I need the productivity rates for first and second fixs for MEP work (HVAc, Firefighting and Plumbing).
Thank you
Pluming Productivity rates
Dear all experts,
I need the productivity rates for first and second fixs for MEP work (HVAc, Firefighting and Plumbing).
Thank you
Excel or PDF format of rates
Good Morning,
The information avaialble here is very useful for me, thanks a lot.
I will be very thankful if excel file or PDF file of all prodcution rates can be shared on my email address: lnt.vikas@gmail.com
Thanks,
Vikas Budhiraja, PMP
Productivity for Platform fabrication & installation
Can anyone help me with the units used to measure progress of platfrom fabrication & welding?
Is it ok to USE ... Kg of steel fabricated or welded?
Productivity for Platform fabrication & installation
Can anyone help me with the units used to measure progress of platfrom fabrication & welding?
Is it ok to USE ... Kg of steel fabricated or welded?
Partitions
Hi Guys,
Just like to know if we have productivity rate for glazing partitions..... also there is no productivity rate for plasterboard installation on the partitioning rates.
Thanks!
Ruel
MEP Productivity Norms
S.N0
Activity
Productivity norms
Qty
Units
DUCTING:
1
Duct
1.2 – 1.5
Sqm/man/day
2
Insulation
3
Sqm/man/day
3
1 No - VAV
3
Sqm/man/day
4
1 No - ECV
2
Sqm/ man/day
5
1 No – Joint Insulation
0.4
Sqm/man/day
6
1 No - Flexible Duct
1
Sqm/man/day
7
1 No - Plenum
1
Sqm/man/day
8
1 No - MSFD
2
Sqm/man/day
9
1 No - VCD
1
Sqm/man/day
10
Pressure Test per 25 Sqm ducting
4.5
Sqm/man/ day
11
Multipurpose Supports – 4 No
1.5
Sqm/man/day
12
Grills & Diffusers
6
No’s / Man/ day
13
Linear Slot Diffuser
6
Rm / Man / day
Kindly note that here ducting is inclusive Support fixing + Cleat fixing + Sealant application
CHW PIPE:
1
1" – 2" dia
7.5
Rm/man/day
2
2" - 3"dia
5
Rm/man/day
3
4"dia
2.5
Rm/man/day
4
6"dia
1.5
Rm/man/day
5
8"dia
1.2
Rm/man/day
6
10"dia
1
Rm/man/day
7
CHW Pipe Insulation
15
Rm/man/day
8
Pressure Test for 100 Rm
3
man/day
9
Valve Package
1.5
Man / day / unit
Kindly note that here Chilled water piping is inclusive of Support fixing
S.N0
Activity
Productivity norms
Qty
Units
ELECTRICAL/ELV
1
Conduit
16
Rm/man/day
2
Wiring
30-40
Rm/man/day
3
Cable tray
5-6
Rm/man/day
4
Trunking
8-10
sq.m/man/day
5
DB Installation
1
Nos/man/day
6
DB Termination
1
Nos/man/day
7
Final Fix Accessories
8
Nos/man/day
8
Light points
8
Nos/man/day
PLUMBING
1
Water supply pipe installation
5
Rm/man/day
2
Drain pipe installation
3
Rm/man/day
Kindly note that Piping Installation is inclusive of Support fixing
Middle East MEP Worker Production rate
Hi all,
I am also facing problem in sourcing MEP labout production rate for Middle East Region. Anyone can help?
regards,
Kevin
Request for clarification....
Hi Frendz ...
I like this section this is helping me in may ways ..but i am facing problem when it comes to productivity rates given without resources, as what resource should i consider if i want to use these rates please help .......
regards,
Khan