Planning and Scheduling Manager (Overall Program Management), San Miguel Aerocity inc., New Manila International Airport

START Date: 
September, 2022

Roles and Responsibilities:

1.     Part of the  program management team

2.     Assigned to  the major packages of the airport projects such as but not limited to Passenger Terminal Complex, Airfield Infrastructures and Landside Infrastructures.

3.     Leads and manages planners and schedulers to ensure smooth delivery of works at all phases of project lifecycle.

4.     Assume overall responsibilities of overall project planning, scheduling development and maintenance.

Experience Hours (Planning & Scheduling): 
2400

Project Planning Engineer (Oil & Gas), Arabi Enertech, Installation of Crude transit Pumps at GCs and Replacement of Separator Control Valve at SEK GCs

START Date: 
February, 2014
END Date: 
June, 2017
  • I developed logical linked overall integrated project execution programs (resourced and cost-loaded) that comply with the planning standard and client requirements
  • I prepared annual capital and operating budgets in line with the work program and prepared the forecast plan and budget
  • I Provided details on materials to ensure the procurement teams have early visibility of the project requirements
  • I prepared the Claims and Variation orders (both Time & Cost)
  • Monitor, control and analyze the project program and cost information using Earned Value methodo
Experience Hours (Planning & Scheduling): 
8850
Experience Hours (Cost Management): 
8500
Experience Hours (Forensic Analysis): 
3450

Project Control, PT. Meindo Elang Indah, Tangguh Expantion Project

START Date: 
March, 2019
END Date: 
March, 2020
Progress control, daily and weekly report. 1 weeek look ahead schedule.
Experience Hours (Planning & Scheduling): 
100
Experience Hours (Cost Management): 
100

Project Control, PT. Meindo Elang Indah, Tangguh Expantion Project

START Date: 
March, 2019
END Date: 
March, 2020
Progress control, daily and weekly report. 1 weeek look ahead schedule.
Experience Hours (Planning & Scheduling): 
100
Experience Hours (Cost Management): 
100

Project Control, PT. Meindo Elang Indah, Tangguh Expantion Project

START Date: 
March, 2019
END Date: 
March, 2020
Progress control, daily and weekly report. 1 weeek look ahead schedule.
Experience Hours (Planning & Scheduling): 
100
Experience Hours (Cost Management): 
100

Engineering Manager, TEPSI Bolivia, FEED & Detailed Designs for Major projects

START Date: 
May, 2016
  • General coordination of Multidisciplinary Engineering Teams (Process, Mechanic, Piping, I&C, Electricity, Civil) during the stages of Conceptual, Basic, Basic Extended, Detail and As Built.
  • General coordination and advice to the client during the different stages of Engineering.
  • Preparation of Bids and Budgets for Engineering projects.
  • Preparation of Cost Estimates.
  • Training of operational personnel in different areas.
  • Preparation, validation and review of documentation of Fire Protection Systems.
  • Technical Leader Managing Engineering

Different Roles Such as Senior Contract Engineer; Construction Manager and Project Manager , Rasuwagadhi Hyderopoer Compeny Limited, Rasuwagadhi HEP (111MW)

START Date: 
April, 2013
END Date: 
September, 2018

In different roles as Senior Contract Engineer, Construction Manager and Project Manager in Rasuwagadhi Hydropower Company Limited.

Different Roles Such as Senior Contract Engineer; Construction Manager and Project Manager , Rasuwagadhi Hyderopoer Compeny Limited, Rasuwagadhi HEP (111MW)

START Date: 
April, 2013
END Date: 
September, 2018

In different roles as Senior Contract Engineer, Construction Manager and Project Manager in Rasuwagadhi Hydropower Company Limited.

Project Manager, MOTA-ENGIL, Schlumberger Logistic Base in Cabinda

START Date: 
August, 2014
END Date: 
May, 2016

Project Management, Planning, Cost and Project Control, Progress update, Technical coordination between disciplines and support on development of Shop Drawings

Experience Hours (Planning & Scheduling): 
3000
Experience Hours (Cost Management): 
2000

project manager;senior cost estimator, China Railway 14th Bureau Group Co., Ltd, Ganzhou-Longyan Rawilay Project, Zhe-Gan Railway renovation project

START Date: 
July, 1975
END Date: 
April, 2006
After graduation from university, I was assigned to a large state-owned construction enterprise, China Railway No.14 Bureau Co., Ltd. I developed as project manager from junior staff; the projects I managed had been obtained good economic benefit for company. During the period of the company, I mainly involved in large-scale railway, highway, building, infrastructure projects such as on-site construction, contract management, cost management and project management, I was in charge of and participated in many railway, highway and infrastructure projects’ bidding management work.
Experience Hours (Planning & Scheduling): 
1000
Experience Hours (Cost Management): 
8000
Experience Hours (Forensic Analysis): 
2000