Project Planning & Management using PRIMAVERA Project Planner (P6.7) & MS Project 2007.
a) Preparation& Tracking of the project master schedule.
b) Identification, monitoring& streamlining of critical paths running through the Project Master Schedule and individual contracts(17 Major Packages).
c) Responsible for total integration of 17 different Package schedule activities to make integrated master L2 schedule.
A total of 9 years experience as Planning Engineer in Energy Power plants, Manufacturing, Floating Liquefaction of Natural Gas unit and Constructions industries.
Professional Since:
Jan-2001(24.7 yrs experience)
Oldest experience:
Jan 2008(17.7 yrs experience, WARNING: 7.0 years variance with Professional Since)
As a planner i am assigned at the BP site in Europoort and at the main office in Gorinchem. I plan the demolition and the re-building of the storage tanks. I am experienced in working with Earned Value Management and in working with Time Management.
Having 20 year experience in the Project Controls Field and 29 years in the construction industry as a whole. Verifiable track record for the successful completions of multi-million dollar project through coordinating trades, developing partnerships and building rapport with engineering, supervision, vendors and clients while maintaining cost. Versed in contract preparation and negotiations. Extensive experience in estimating, planning, scheduling, cost development and management and project analysis. I also have my TWIC Card and US passport.
Here are a list of my strengths
Professional Since:
Jul-1990(35.2 yrs experience)
Oldest experience:
Dec 2006(18.8 yrs experience, WARNING: 16.4 years variance with Professional Since)