Project Planning & Management using PRIMAVERA Project Planner (P6.7) & MS Project 2007.
a) Preparation& Tracking of the project master schedule.
b) Identification, monitoring& streamlining of critical paths running through the Project Master Schedule and individual contracts(17 Major Packages).
c) Responsible for total integration of 17 different Package schedule activities to make integrated master L2 schedule.
A total of 9 years experience as Planning Engineer in Energy Power plants, Manufacturing, Floating Liquefaction of Natural Gas unit and Constructions industries.
Professional Since:
Jan-2001(24.7 yrs experience)
Oldest experience:
Jan 2008(17.7 yrs experience, WARNING: 7.0 years variance with Professional Since)
As a planner i am assigned at the BP site in Europoort and at the main office in Gorinchem. I plan the demolition and the re-building of the storage tanks. I am experienced in working with Earned Value Management and in working with Time Management.