Engineering

Various lead position, Conocophillips, ConocoPhillips

START Date: 
June, 2002

Erwin has successfully performed many critical roles

Project Engineer / Planner, ELEF SpA, Cityringen (Copenhagen METRO)

START Date: 
December, 2017

Project planning and control and support for the development of the procedures for the management of the project and interface with the client.

Instrument Engineer, Fine Organics, Multiple Projects

START Date: 
January, 1989
END Date: 
May, 1989

Instrument engineer working on design for multiple projects on a chemical plant.

Experience Hours (Planning & Scheduling): 
500

Project Engineer, Betathorne Ltd., Multiple Projects

START Date: 
May, 1989
END Date: 
May, 1992

Project Engineer for multiple Projects in the petrochemical and oil and gas industry

Experience Hours (Planning & Scheduling): 
3000
Experience Hours (Cost Management): 
1000

Project Engineer, John Boyd Associated, Multiple Projects

START Date: 
May, 1992
END Date: 
May, 1994

Project Engineer on Multiple Projects in the Petro Chemical industry

Experience Hours (Planning & Scheduling): 
2000
Experience Hours (Cost Management): 
500

Various duties, Foster Wheeler, (various projects)

START Date: 
September, 1997
END Date: 
December, 2004
Various positions on design, engineering etc - both at home office and construction site.
Experience Hours (Planning & Scheduling): 
1400
Experience Hours (Cost Management): 
2000

Avionics Engineering Software Support Manager, Senior Avionics Systems Technical Officer, RAAF, (various projects)

START Date: 
July, 1981
END Date: 
February, 1989

Manager for Inertial Navigation Systems and GenRad Automatic Logic Test Systems.

Researched, designed and developed a modification to the P3 Orion Automatic Flight Control System to eliminate the aircraft from ‘porpoising’ during flight.  This modification had world wide P3 fleet implications.

Developed a Defence trial modification for the installation of GPS Navigation into the P3 Orion aircraft.

Experience Hours (Planning & Scheduling): 
250
Experience Hours (Cost Management): 
250
Experience Hours (Forensic Analysis): 
250

Piping and Mechanical Design Engineer, Chiyoda, Prosep sdn bhd, Sapura, Offshore and FPSO, Onshore

START Date: 
January, 2004
JayKashEngineering & Design is founded on 2010 by Mr. Kumaran. JayKash is a company that is providing engineering and services for both the marine, oil and gas industries throughout the market. Our company is located in NegeriSembilan, Malaysia. JayKashhas a dedicated team with good experience and track record in providing design package for Fuel Gas, LP/HP Separator, Heat Exchanger, Electric Heater, Compressor, Pumps, Metering Skids, Produced Water Treatment Package, TEG Package etc. Also provide Structural & Piping Analysis design and calculation.

Senior Project Services Engineer, SNC - LAVALIN INTERNATIONAL INC., Fired Steam Power Plant Project 300-400MW

START Date: 
December, 2008
END Date: 
December, 2009

Directly responsible for provision and coordination of all activities in the project including cost control, invoicing, variation claims, change management, planning, payment resolution, as well as the creation, negotiation, and management of contracts.  Managed project execution, stakeholder engagement,resource allocation, and governance processes throughout the project lifecycle.Analyzed reports for profitability, manpower productivity, efficiency, and resources.  

Experience Hours (Planning & Scheduling): 
650
Experience Hours (Cost Management): 
800
Experience Hours (Forensic Analysis): 
1100

Planner, Engineering Assistant, Monadelphous Engineering Construction, Cape Lambert Phase A & B

START Date: 
June, 2012
  • Compiling area schedule, progress, and forecast reports for integration into scheduled project reports to client and in-house management.
  • Integrate safety targets into progress reporting to ensure the project met the Client and Monadelphous safety expectations.
  • Develop and grow client relationships
  • Manage manning Levels throughout the construction phase
  • Manage the progress achievable week by week with const
Experience Hours (Planning & Scheduling): 
6000

Market Place

Primavera P6 and Microsoft Project books, on-line video training courses and training material available from an internationally recognised publisher and PMI accredited REP. Teach yourself using on-line or book based learning or run your own in-house or public PMI accredited courses.
For 25+ years, APMX has been providing competency based project management training to Fortune 500 companies around the world, applying the principles of project based learning, designed to produce measurable results, generating a favorable “return on training investment”.
See how the TIME - LOCATION - VIEW brings clearness to your work programmes
Syndicate content