Duties include preparing Primavera schedule of works for all related works detailed to Level 3, loaded with budgeted cost; updating schedule of works on weekly basis together with the status of materials; preparing cost control reports after verification of cost codes, comparing with BOQ prices, checking variations; responsible for quality and procurement of all civil permanent material; guided all architecture and civil shop drawings related to 12,000 m².