Guild of Project Controls: Compendium | Roles | Assessment | Certifications | Membership

Engineering Planner, SRK Consulting (Pty) Ltd, Nacala Corridor Project

START Date: 
April, 2012

 

SRK ConsultingPlannerMay 2012 – Present (11 months)MalawiNacala Corridor Project – Railway (USD 800M)This project is part of the Nacala Corridor Project between Mozambique Border andNkaya Junction. The railway crossed 140 kilometres of rural countryside, for the mostpart, on the Southern Region of Malawi. 29 railway bridges with precast beams and indirect foundations. Planning and managing in piling, bridges, earthworks and track work production Planning and Managing in piling, bridges and earthworks production department. Develop / Identify Work Breakdown Structure for Project Schedules Contribute appropriately to daily, weekly and monthly reports Measure performance against requirements and provide feedback and support Promote the Company’s standardised planning practices and reporting systems Managed Design/Drawing register on Aconex (Project Management andDocument Management Server) Health and safety aspects on site. Ensure Quality control with reinforcement and detailed design in piles and pilefoundations for bridges Junior Engineer (Hydrology and Hydraulics)SRK ConsultingDelmas (Kusile Power Station)January 2012Design of Channels to decrease Hydraulic jumps caused by excess runoff within thesite. Mogalakwena Polokwane MunicipalityJanuary 2012- May 2012Water and sanitation group Specialized in Solinst equipment which is used to monitor groundwater forgeneral site investigations and for contaminant plume monitoring on: spill sites,remediation sites, chemical storage facilities, landfill sites and hazardous wastestorage sites. Water level Data analysis of boreholes using Solinst software andinstruments to calculate water flow and draw down. Obtain surface and ground water samples Measurements and recordings of concentrations of various water parameters. Estimate hydraulic conductivity and other aquifer conditions Provide Municipality on weekly basis with reports indicating Critical Boreholes Impala Platinum-UG2 Data Analysis (Solinst)January 2012- May 2012 Monitor tailings ponds, dewatering activities and water supply levels of mines. Obtain Tailings runoff samples (level loggers) Record data and monitor spill sites and return water dams Chloorkop Gypsum DamHeartland Leasing Water balance and water management scheme Wemmerpam Damflood level and storm water management design.