Guild of Project Controls: Compendium | Roles | Assessment | Certifications | Membership

Engineering Planner

Engineering Planner, ESKOM, Medupi Coal Fired Power Station – South Africa

START Date: 
January, 2012

Started out as a Junior Planner for Eskom's Engineering Division on the Medupi Power Station Project and am now Senior Planning Advisor.

Been responsible for progress updates, schedule development and cost management.

Experience Hours (Planning & Scheduling): 
14000
Experience Hours (Cost Management): 
4000

Engineering Planner, GE Oil & Gas, 15 GE frames F Open Cycle Oil Power Plant project

START Date: 
October, 2010
END Date: 
April, 2011

Summary of my responsibilities are:

Experience Hours (Planning & Scheduling): 
900
Experience Hours (Cost Management): 
300

Engineering Planner, Aker Solutions, MMO -Snorre /Gullfaks

START Date: 
October, 2010
END Date: 
March, 2016

 As Sr.Planning Engineer-Projects

Experience Hours (Planning & Scheduling): 
9600

Engineering Planner, Aker Solutions, MMO -Snorre /Gullfaks

START Date: 
October, 2010
END Date: 
March, 2016

 As Sr.Planning Engineer-Projects

Experience Hours (Planning & Scheduling): 
9600

Transmission Design Planner, Network Rail, FTN /GSM-R Programme

START Date: 
January, 2005
END Date: 
July, 2005

 

Engineering Planner, GE Oil & Gas, Subsea Trees

START Date: 
October, 2010

Summary of my responsibilities are:

 

  • Construct and manage detailed planning schedules, utilizing Primavera P6 software, that represent activities required to successfully deliver key project / scheme milestones;
  • Developplans to sufficient detail to ensure effective control of all project deliverables.
  • Identifycritical activities and continuously monitor and report to project manager
  • Generateproject reports that reflect the actual project status both with respect to time and performance
  • Ensure planning and reporting require

ENGINEERING PLANNER, J.Ray McDermott Asia Pacific, EPCIC ESSO

START Date: 
January, 2009
END Date: 
August, 2010

ENGINEERING PLANNER. Projects involved in Fabrication of Topside, Jacket & Pipeline, and Riser Access Tower. Responsible in planning Drawings with respect to the need in Procurement and Fabrication. Provides reports for each Discipline the progress completed: Productivity, Deliverable Curves per stage of drawing (IDC, IFA, AFD & AFC), Forecasting Manpower (in Histogram), Progress Status for Cost, Time & Resource (CTR), Look Ahead and Late Reports, and, Overall Document Progress Percentage Status Table complete with S-Curves.

Engineering Planner, Fluor, Mining & Resource Industry

START Date: 
December, 2008
END Date: 
December, 2010

Engineering Planner on the BHP rapid growth programme - Fluor and SKM

Market Place