Logikal

Logikal

Logikal Planner

Seconded to Honeywell Systems
Heathrow Terminal 5, London - £100 million (Overall T5 project: £4 Billion)
Project Planner/Project Co-ordinator
April 2007 – April 2008

     Project
• Installation, validation and cause and effect testing of the fire detection and alarm system at Heathrow Terminal 5. Included 333 individual fire detection panels

     Duties and Responsibilities
• Created and managed project plans (P3 and MS Project), and reported progress on a monthly basis to the overall Terminal 5 project group.

Logikal Planner

Seconded to Balfour Beatty and Carillion Joint Venture
East London Line Project, London - £350 million
Project Planner
April 2008 – Current

Project
•The extension, replacement and refurbishment of the East London Line, transforming the line into a major artery in the London rail transport network.

•Duties and Responsibilities