Foster Wheeler Senior Planner

ExonMobil
(SPT) Singapore Parallel Train (EPCm)
Reading, UK
With Worley Parsons a joint venture (FWP)
An amalgamation of a number of individual “grass roots” and “Revamp” expansion and upgrade projects, including Utilities, New Substation and interconnects, 5K of new modular built Piperack, Underground Piping & Electrical Cabling, Secondary Process Units Acid Gas Remover, Amine Wash, Desalter, re-optimization of existing Tankage via rehabilitation and service change and new tanks. Included a multitude of interfaces; four separate plant area ‘Turn Around’s’ and over 600 tie-in points.

Based in home office of FWEL Reading, UK, during engineering phase the role consisted of Sub contract bid reviewing, Level IV construction planning & Sequencing feeding back to level III, Maintaining close links / coordination with construction team, schedule interfaces, coordinating Reading projects logistics issues & consolidating input, Heavy lift schedule input, Cross project integration, coordination of Turn Around Job pack’s & Early systems.