Configuration Planner, Material Planner, Planning Engineer, Project Controls Manager, CFW PRECISION METAL COMPONENTS, Aircraft Interior manufacturing

START Date: 
March, 2012

Material Planner: 

  • Analyzed and ordered all required material while utilizing beneficial purchasing techniques (order policies, period orders, etc.) with respect to inventory turns, cost, and lead times.
  • Initiated and implemented facility wide processes which successfully lowered inventory while decreasing shortages on the production floor. Order policies, Period orders, safety stock , etc…

Configuration Planner:

Experience Hours (Planning & Scheduling): 
14000
Experience Hours (Cost Management): 
8000

Plant Operator-Utilities/Pumping & Shipping, CALTEX (Philippines) Refinery, Philippines , Various in-house projects, operation's productivity program, production planning and scheduling

START Date: 
July, 1979
END Date: 
June, 1981
My functions includes the following: Obtain accurate process reading, determine stock transfers and shipments, perform product inventory, blend products, operate the TEL plant, periodic sampling and operation of plant equipment, safety inspection, switching, transferring, feeding in of petroleum products and derivatives to different process unit, equipment maintenance, shutdown, start ups, o
Experience Hours (Planning & Scheduling): 
2550
Experience Hours (Cost Management): 
800
Experience Hours (Forensic Analysis): 
600

PLANNING ENGINEER, Greenline Yacht Interiors, MY COCO, MY ECLIPSE, MY RIVIERA, MY ROYAL FALCON FLEET, MY SWIFT

START Date: 
June, 2009
END Date: 
July, 2011

·        Preparation of Level 1 schedules for prospective projects along with the jobs in hand to forecast the manpower             requirement.

·        Preparation, tracking and updating of the level 2 schedules to be used by the COO for his meetings with the Clients.

·        Preparation of Level 4 programs by discussing with the Project Managers, Design Managers and the Production Manager.

Graduate Planner, GMM Pfaudler Ltd - India, Original Equipment Planning Department

START Date: 
September, 2003
END Date: 
April, 2004

GMM Pfaudler Limited is a leading supplier of engineered equipment and systems for critical applications in the global oil & gas, chemical, and pharmaceutical markets - owned by US based Robbins & Myers Inc.



 

Fleet Planning Engineer ( & Planning support), British Airways Engineering, Aircraft Maintenance

START Date: 
January, 1989
END Date: 
September, 2006

 

1989 – 2006             British Airways Engineering

1989- 1997               Aircraft Technician 

1997 – 1998             Zone Co-ordinator

PLANNING AND CONTROL MANAGER, Navalria, Drydocks S.A., Lisbonense and Almadense Construction

START Date: 
March, 2009
END Date: 
October, 2010

.Strategic Planning for Ship Construction. Implement and control schedules for new constructions.

. Budget Control for each ship construction.

. Reporting progress for major stakeholders.

PLANNING ENGINEER, Cleveland Bridge UK Ltd, Various Rail & Road Bridge Projects

START Date: 
April, 2008

Planning Engineer working at the Company’s head office / fabrication facility in Darlington, using Primavera P6 computer systems, with supporting documentation / reports produced using various Microsoft packages in-line with the company’s control system. Working on fabrication, construction and EPC projects.

Experience Hours (Planning & Scheduling): 
16000
Experience Hours (Cost Management): 
5000