Guild of Project Controls: Compendium | Roles | Assessment | Certifications | Membership

Daily/Weekly/Monthly Project reports

Site Project Controls Engineer, Exxon Mobil, EPC1 Banyu Urip Project ExxonMobil Cepu Limited

START Date: 
April, 2014
END Date: 
September, 2015

• Provide stewardship for Functional Support and daily-weekly reporting (POB, Dia-In Piping and QC cheksheet).
• Review and monitor the Contractor’s performance in the areas of scheduling and progress measurement, also provide input as necessary to assist the Company’s milestone are achieved.
• Prepare all required weekly reports and provide project execution report into the Project Execution Monthly Report.
• Coordinate with Construction team and Contractor team to maintain the target schedule as Contractor 3 week look ahead plan.

Project controls specialist/Lead scheduler, Earth Tech, AECOM, University Link Extension Project, Seattle, WA

START Date: 
January, 2007
END Date: 
January, 2009

University Link Extension Project, Seattle, WA – Michael served as a member of the JV Team project control staff acting as on-site scheduler for the $38 million design phase of the University Link Light Rail tunnel and stations project. The $1.9 billion project includes 3.15 miles of twin-bore tunnel and two major underground transit stations for a transit extension from downtown Seattle to the University of Washington.

Experience Hours (Planning & Scheduling): 
2000
Experience Hours (Cost Management): 
1800
Experience Hours (Forensic Analysis): 
200

Project controls specialist/Lead scheduler, AECOM, Earth Tech, Seattle, University Link Extension Project, WA

START Date: 
January, 2007
END Date: 
January, 2009

University Link Extension Project, Seattle, WA – Michael served as a member of the JV Team project control staff acting as on-site scheduler for the $38 million design phase of the University Link Light Rail tunnel and stations project. The $1.9 billion project includes 3.15 miles of twin-bore tunnel and two major underground transit stations for a transit extension from downtown Seattle to the University of Washington.

Experience Hours (Planning & Scheduling): 
1400
Experience Hours (Cost Management): 
600
Experience Hours (Forensic Analysis): 
0

Planning Engineer, Power Point L.L.C, Jumeriah Park Package 2 and 2a – 4 Bedroom- 525 Villa, Platinum Tower – 4B + G + 44 Floor Office Building

START Date: 
August, 2008
END Date: 
August, 2009
• Preparing detailed planning program using Primavera software ( P3 )• Monitoring the progress with respect to the baseline program.• Daily and Weekly Report Issue.• Preparation of manpower requirement for the project.• Project Productivity Monitoring, Reporting and Controlling.• Preparation of Monthly and Weekly report for Client and Internal Review.• Material delivery schedule preparation according to the requirement at site.• PRepare Monthly Incoive and Coordinate with Main Contractor till Approval.
Experience Hours (Planning & Scheduling): 
3250
Experience Hours (Cost Management): 
1000

P6 Planning Engineer, Byzak (part of Enterprise group), Water treatment projects

START Date: 
September, 2011
END Date: 
April, 2013
• Prepare the work breakdown and project detail activities for Clause 31 programme (Baseline) with P6 and MSP for control and integrity of work to be performed, as defined by the contract • Maintain and issue Clause 32 (Monthly Updated Programme) based NEC3 contract on a timely basis to support project reporting including variance analysis and critical path analysis
Experience Hours (Planning & Scheduling): 
3000
Experience Hours (Cost Management): 
3000

Assistant / Planning Engineer, Mabani Delma General Contract Co, Asset Enhancement Scheme ,stage-1 in Abu Dhabi

START Date: 
June, 2013

Planning Engineer

. Progress Monitoring

.Preparation of Daily, weekly , monthly reports.

Sr. Planning Engineer, Carillion Alawi LLC, 2x60MW Thermal Power Plant, Infrastructure Building (Parliament Building)

START Date: 
February, 2009
END Date: 
February, 2011

Summary

Experience in Power Plants, & Infrastructure Building Projects.
Experience in Project Management; Quantity & Cost Estimation, Proposal & Analysis.
Technically sound in Primavera 3.1 & 6 version, MS Project 2007,AutoCAD & STAAD PRO, Asta Powerprojects, MS Office 2007.
A versatile communicator and possess abilities in leading and building a team.
High-end satisfaction level and hard working for achieving quality results.

Market Place

Primavera P6 and Microsoft Project books, on-line video training courses and training material available from an internationally recognised publisher. Teach yourself using on-line or book based learning or run your own in-house or public courses.
Syndicate content