GUILD News Flash | Bringing recognition to the Project Controls Profession

Cost

Consultant, CDP, Shipyard

Primavera Consultant - Providing instruction and consultanting for varying projects and industries.

Experience start date: 
September, 2011
Experience end date: 
February, 2013
Map picker: 

senior planner; lead planner; project controls manager, SNC, & Various commercial

Senior planner in engineering, procurement and construction. Oil & Gas; Mining; Power Projects

Experience start date: 
March, 1978
Map picker: 

Associate Project Manager, IBM del Peru, PetroPeru, Avicola El Rocio, CERTICOM

• Conduction of an Outsourcing (IT Services) in the Oil Industry. 60 FTE’s. Customer Satisfaction 95%. Contract renewal for US$ 2.8 MM. Deployment of a J.D. Edwards module (Maintenance) within budget and schedule. Delivery of a Business Intelligence Pilot.
• Project Manager for the delivery of a SAP R/3 project in the Poultry Industry, which included the SD, MM, PP, QM, FI, CO, CO-PA modules. Project scope and value was extended to cope with the customer’s new requirements, from US$ 350 K to US$ 500 K.

Experience start date: 
October, 1997
Experience end date: 
December, 2000
Map picker: 

Associate Project Manager, IBM del Peru, PetroPeru, Avicola El Rocio, CERTICOM

• Conduction of an Outsourcing (IT Services) in the Oil Industry. 60 FTE’s. Customer Satisfaction 95%. Contract renewal for US$ 2.8 MM. Deployment of a J.D. Edwards module (Maintenance) within budget and schedule. Delivery of a Business Intelligence Pilot.
• Project Manager for the delivery of a SAP R/3 project in the Poultry Industry, which included the SD, MM, PP, QM, FI, CO, CO-PA modules. Project scope and value was extended to cope with the customer’s new requirements, from US$ 350 K to US$ 500 K.

Experience start date: 
October, 1997
Experience end date: 
December, 2000
Map picker: 

Project Control Manager, Saipem SpA, GNL3Z Arzew. Algerie

Project Control Manager at GNL3Z Arzew Project. 4Billion eueq, 15Million MHrs standard, 40Million MHrs Spent, 11k MPower, 800 project team members, 12 Project Management Team, 26 Project Control team members, 6 nationalities, 48 Months construction phase.

Experience start date: 
June, 2009
Map picker: 

Senior Planning & Project Control Engineer, ConocoPhillips Indonesia, Onshore and Offshore

Responsibilities:

  • Develop planning and scheduling, progress measurement and progress reporting requirements and to incorporate them into the Tenders / Agreements (FEED, EPC)
  • Depth-in review and analysis of all submittals from contractors related to planning, scheduling, progress measurement, reporting, time analysis, project resource loading, critical path, productivity, compliance with work breakdown structure, production of 'what if scenario, individual plan to suit both COPI, BP Migas and Contractors, includes verification of
Experience start date: 
August, 2011
Experience end date: 
March, 2012
Map picker: 

Project Controls Manager, Arabian Consulting Engineering Centre, Luberef II Project (Mobil) / Saudi Aramco Bulk Plant estimates

Completed long term assignment for Mobil ($380M Luberef II) plus several small Saudi Aramco Projects

Experience start date: 
November, 1995
Experience end date: 
January, 1999
Map picker: 

Project Controls (Budget/Schedule Engineer), Tefirom Group, Several Projects

- Take active role in tender stages of upcoming projects, analyzing the work schedule and technical details from a financial and commercial perspective, creating a budget plan which is dependent to duration and fiction of each single project.

- Analyzing the annual budget study and to determine if it is realistic, complete and cost-effective,

- Recommend on how the budget study could be improved to minimize waste and maximize efficiency,

Experience start date: 
April, 2011
Experience end date: 
September, 2011
Map picker: 

Project Controls (Budget/Schedule Engineer), Tefirom Group, Several Projects

- Take active role in tender stages of upcoming projects, analyzing the work schedule and technical details from a financial and commercial perspective, creating a budget plan which is dependent to duration and fiction of each single project.

- Analyzing the annual budget study and to determine if it is realistic, complete and cost-effective,

- Recommend on how the budget study could be improved to minimize waste and maximize efficiency,

Experience start date: 
April, 2011
Experience end date: 
September, 2011
Map picker: 

Cost Controller, "Tekfen Construction and Installation Co., Inc.", Utilities & Offsites Umbrella (UOU) Main Construction Works Package for PETRORabigh Development Project

- Elaborate the consolidated Cost Breakdown Structure on the base of the Commercial Budget, the available feedback from tender documents, the risks profile, the needs to return data to Commercial Department; recast the Commercial Budget in the established Cost Breakdown Structure and issue of the Control Budget as per internal procedures,

-Identify the cost control resources necessary to control the project,

- Monitor cost coding system is properly applied and information flow is correct and complete,

Experience start date: 
December, 2007
Experience end date: 
May, 2009
Map picker: 

PP Market Place:
Asta Powerproject
: A comprehensive product suite with the flexibility to meet the varying needs of everyone involved in running projects (Software) Read more...
Syndicate content