%100 Project Planning; Progress Reporting; Primavera P6; Programme Integrity Checks;Tender programme

Senior Planner, AECOM, BAA Heathrow T1 HBS Upgrade & Baggage Prolongation, Canada Water, Luton Airport expansion

START Date: 
November, 2022

Recruited as Senior Planner to AECOM, and worked across many projects. Initially started on Future Luton expansion programme as both PMO and Design Lead Planner, and was then given further projects including HE Blackcat project, Heathrow Baggage, Canada Water, Thames Lower Crossing, etc.

I was then moved to Network Rail NRDD South to support them fixing their portfolio as it was no under control

Experience Hours (Planning & Scheduling): 
3300
Experience Hours (Forensic Analysis): 
150

#Planning Engineer #Planning #projectcontrols # construction #build #residential, El-Seif Engineering Contracting, KAP2B

START Date: 
December, 2014
END Date: 
December, 2016
 Executed featured projects (KAP2B) at KSA for MOI (Contract Value $200m, Design and Buildcontract) Created a detailed baseline schedule (Level 4) for each site (5 sites), consisted of 40+ constructionbuildings including Civil and MEP with infrastructure works Established the project’s Work Breakdown Structure (WBS) in coordination with the Management. Built strong communication channels with the site-based management team and Head Office Developed expertise in Primavera (P6.7) and MS Excel software to tackle and manag
Experience Hours (Planning & Scheduling): 
3000
Experience Hours (Cost Management): 
2000
Experience Hours (Forensic Analysis): 
250

#Planning Engineer #Planning #projectcontrols # construction #build #residential, El-Seif Engineering Contracting, KAP2B

START Date: 
December, 2014
END Date: 
December, 2016
 Executed featured projects (KAP2B) at KSA for MOI (Contract Value $200m, Design and Buildcontract) Created a detailed baseline schedule (Level 4) for each site (5 sites), consisted of 40+ constructionbuildings including Civil and MEP with infrastructure works Established the project’s Work Breakdown Structure (WBS) in coordination with the Management. Built strong communication channels with the site-based management team and Head Office Developed expertise in Primavera (P6.7) and MS Excel software to tackle and manag
Experience Hours (Planning & Scheduling): 
3000
Experience Hours (Cost Management): 
2000
Experience Hours (Forensic Analysis): 
250

Snr Planner, Planning Manager, Morgan Sindall Infrastructure, Airfield Project – Heathrow Airport

START Date: 
September, 2005

Senior Planner / Planning Manager

Producing, reviewing and implementing planning strategies and integrating multi-disciplined projects in a variety of live operational environments. Responsible for delivering projects whilst ensuring disruption to existing airport operations and facilities were kept to a minimum

Provision and maintenance of the Master Schedule

Developing robust programmes

Experience Hours (Planning & Scheduling): 
22000
Experience Hours (Cost Management): 
10000
Experience Hours (Forensic Analysis): 
500