Skip to main content
Website Upgrade Beta Phase - we’re working on a new look (and speed!). Help us improve PlanningPlanet.com by sharing feedback.
PPadmin@planningplanet.com
Home
  • Home
  • Discussion forum
  • Wiki
    • Schedule Maintenance
      • Software Settings
      • Progress Update
        • Delay Analysis
        • Delay Analysis
      • Progress Recording
    • Schedule Usage
      • Levels of Reporting
      • Performance Reporting
        • Trend Anaysis
        • Progress Reporting
      • Schedule Impact Concepts
      • Communicating the Plan
      • Deliverables
      • Variance Reporting
      • Float Management
      • The Purpose of the Project Schedule
      • Milestone Management
      • Trending
      • Openings
      • Utilizing CPM Schedules to Track Resources Can Cuts Costs
    • Schedule Construction
      • Activity Codes
        • Defining Activity Codes in Primavera 6 R8.1
      • Activity Durations
        • Rates, Norms & Durations
          • Shipbuilding
          • Fitout & Finishes
            • Stone Cladding
            • Soft Landscaping
            • Wall & Ceiling Coverings
            • Facade Waterproofing
              • Asphalt Waterproofing
              • Bituminous Waterproofing
              • Bentonite Waterproofing
              • Epoxy Waterproofing
              • Doors & Window Installation
              • Glazing
              • Curtain Walling
              • Facade Cleaning
              • Cladding Restoration
            • Kitchen Installations
            • Painting & Decorations
              • Preparatory Works
              • Timber
                • Internally
              • Walls
                • Internally
                • Externally
                  • Brickwork
              • Floors
              • Ceilings
              • Steel
                • Internally
                • Externally
            • Restoration Works
            • Rendering
            • Floor Finishes
            • Ceiling Finishes
            • Carpentry Final Fixing
            • Carpentry Carcassing
            • Carpentry & Joinery
          • Petrochemical Oil & Gas
            • Pipeline Construction
          • Power Generation & Nuclear
          • Transportation
            • Conveying Systems
              • Hoists & Cranes
                • Rail Grab
                • Crane Grab
                • Hydraulic Excavator
              • Equipment Conveying decks
            • Railways
              • Floating Track Slab
              • Trackwork
              • Transportation Power Supply
              • Electrical System
            • Cable Car
          • Roads & Infrastructure
            • Road Markings
            • Road Surfaces
              • Concrete Road surfacing
            • Road Basecourse
            • Kerbs & Paving
          • Tunnelling & Mining
            • Design Works
            • Drill & Blast Method
            • New Austrian Tunneling Method
            • Tunnel Boring Machines
            • Shield Tunnelling
            • Headings & Hand Tunneling
              • Vertical Shafts
            • Chemical Excavation Methods
              • Cone Fracture Rock Breakage
            • Initial Tunnel Supports
            • Permanent Bracings
            • In-Situ Tunnel Linings
            • Tunnel Grouting
            • Immersed & Sunken Tubes
            • Micro-Tunneling
            • Cut and Cover Tunnels
            • Tunnel Leak Repairs
            • Pipe & Box Jacking
          • Pharmaceutical
          • IT Engineering Projects
            • 005 Initiate Phase
            • 010 Analyse Phase
            • 015 Design Phase
            • 020 Develop Phase
            • 025 Test Phase
            • 030 Implement Phase
            • 035 Support Phase
          • Building Services / E&M
            • Escalator Installation
            • Define First Fix
            • Define Second Fix
            • Lift Installation
            • Fibre Cables
          • Bridges
            • Covered Steel Footbridge
            • Design
            • Formwork & Bases
            • Structural Steelwork
            • Cable Stringing
            • Bridge Decking
              • Traffic Decking
            • Paintwork
            • Final Finishes
            • Bridge Items - Work Activity Base Production Rates in USA
          • Automotive
          • Defence Sector
          • Health & Healthcare
          • Water Management
            • Elevated Watercourse
          • Building & Construction
            • Foundation Works
              • Contigous Piling
              • Driven Piles
              • Mini Piling
              • Bored Piling
              • Secant Piling
              • Hand Dug Caissons
              • Underpinning
              • Grouting Operations
                • Grouting
              • Sheet Piling & Strutting
                • Strutting
                • Sheet Piling
                • Secant Piling
              • Barrette Piles
              • Diaphragm Walling
              • Ground Anchors
                • Multiple Bell Ground Anchors
                • Removable Ground Anchors
              • Slurry & Soil Mix Walls
                • Slurry Mix Wall
                • Soil Mix Walls
            • Preparation Works
              • Site Clearance
                • Site Clearance
              • Site Investigation
                • Instrumentation
              • Construction Design
            • Earthworks & Excavation
              • Spread & Leveling
              • Dewatering
                • Cofferdam Works
                • Dewatering
              • Ground Compaction
                • Deep Compaction
                • Compact & Consolidate
                • Hand Fill & Compact
              • Ground Monitoring
              • Basement Excavations
                • Excavate and Remove
                • Basement Excavation
              • Trench Excavations
                • Traditional mass fill foundations
              • Excavation Works
                • Material Weights
                • Ground Excavation
                • Excavate & Load
                • Spoil By Barge
                • Spoil By Conveyor
              • Reclamation & Filling
              • Excavate & Reduce Levels
              • Steel Strutting
              • Bulk Excavation
              • Bell Ground Anchors
              • Bored Piling
            • Building Frameworks
              • Metal Frameworks
                • Roof Structure
              • Timber Frameworks
                • Roof Structure
                • Timber frame superstructure
              • Curtain Walling
            • Wet Trade Finishes
              • Blockwork
              • Plastering
              • Rendering
              • Screeding
              • Plasterboard
            • Roofs & Waterproofing
              • Flat & Layered Roofs
                • Asphalt Roofs
                • Felt Roofs
              • Metal Roof Decking
                • Metal Decking
                • Lead Roofing
                • Copper Roofing
                • Zinc Roofing
                • Aluminium Roofing
                • Titanium Roofing
                • Metal Features
              • Roof Lights
              • Sheeted Roofs
                • Asbestos Roofs
                • Profiled Sheeting
                • Sheeted Roofs
              • Tiled Roofs
                • Slate Roofs
                • Tiled Roofs
              • Rainwater Works
                • Guttering & Pipes
              • Roof Insulation
              • Thermal & Moisture Protection
                • Polythene Waterproofing
                • P.V.C. Sheeting
                • Gravel Chippings
              • Waterproofing
            • Demolition & Break Out
              • Housing Demolitions
              • Breaking Out & Openings
                • Breaking Out
                • Cutting Holes
                  • Common Brickwork
              • Cutting Back
              • Cutting Chases
              • Cutting Switchboxes
            • Concrete Related Works
              • Formwork
                • Formwork Re-Use
                • Waffle Flooring
                • Tunnel Forms
                • Hollorib Decking
                • Beam Falsework Formwork
                • Footing formwork
                • Raft formwork
                • Walls formwork
                • Staircase formwork
                • Ramp formwork
                • Shades Formwork
                • Formwork
              • Reinforcement
                • Reinforcement
                • Footing Reinforcement
                • Walls Reinforcement
                • Staircase Reinforcement
                • Reinforcement Ratios
              • Placement & Finishing
                • Concrete Pumping
                • Concrete Cycle Times
                  • Slip Forming
                • Place Concrete
                • OFC Laying
                • Concrete Finishing
              • Pre-Cast Works
              • Post Tensioning Works
                • Post Tensioning
              • Mixing Concrete
            • Granolithic Flooring
            • Sand / Cement Floor Screeding
            • Terrazzo Flooring
            • Mosaic Tiles
            • Computer Room / Raised Floors
            • Wood Block Flooring
            • Working Platforms
            • Tower Cranes
            • Partitioning
            • Drainage, Manholes and Gulleys
            • Fencing Works
            • Blockwork
            • Decking
          • Rule of Thumb
      • Budget & Cost Loading
      • CBS Codes
      • Calendars
      • Constraints
      • Crew size and mix
      • EPS Codes
      • Estimating
      • Hammock Tasks
      • Implementing Schedules
        • Project Control in Construction for Mining
        • Common Scheduling Mistakes
          • Human mistakes
      • Logic, Leads & Lags
        • Finish to Start Vs Start to Finish Relations in Primavera Project Planner P6
      • Network Rules
      • OBS Codes
      • OBS and EPS in Primavera P6
      • Programme Narrative
      • How Lean Construction Principles and Critical Path Methods Enhance One Another
      • Resource Loading
      • Resource Levelling
      • Schedule Levels
      • WBS Structure
    • Planning Terms
      • Bar
      • Budget
      • Schedule Variance
      • Activity ID
      • Bar Chart
      • Calendar
      • Constraint
      • Activity Duration
      • Critical Path Method
      • Free Float
      • Total Float
      • Activity
      • Earned Value Analysis
      • Arrow Diagram Method
      • Precedence Diagram Method
      • Windows Analysis
      • What-If Analysis
      • Work Breakdown Structure
      • Variance
      • Turnaround Document
      • Time Now
      • Time Impact Analysis
      • Start-to-Start
      • Start-to-Finish
        • Start to Finish
      • Slippage
      • Schedule Performance Index
      • Retained Logic
      • Progress Report
      • Progress Override
      • Programme
      • Planning Planet
      • Planning
      • Mitigation
      • Master Programme
      • Key Performance Indicator
      • Hammock
      • Gantt Chart
      • Cycle Time
      • Baseline Management
      • Work Package
      • Baseline Schedule
      • Critical Activity
      • Critical Path
      • Integrated Master Schedule
      • Current Schedule
      • Schedule Update
      • Relationship
      • Linear Planning
      • Data Date
      • PERT
      • BCWS
        • ACWP
        • BCWP
      • Critical Path DRAG
      • Scheduling
      • Project Controls
      • Cost Engineering
      • Integrated Project Delivery (IPD)
      • Latest Start Date
      • Earliest Finish Date
      • Latest Finish Date
      • Progress Over-Ride
      • Zero Float
    • Professional Growth
      • Core Competencies
      • Planner Recognition
        • Consultado Brasileiro
        • Professional Development for Project Controls
          • 6 Simple/clean ways to Stay Motivated for the PMP Exam:
      • Q&A from Planning Planet Experts
        • "Mr P6 Heavy Civils"
          • Promotion of activity codes in Oracle Primavera P6
          • Calendar for scheduling relationship lags
        • "Mr Risk"
          • Risk Registers or Schedule Analysis
          • Optimistic and Pessimistic Durations
      • Seven Signs of Incompetent Managers
      • Books & Book Reviews
        • CPM Scheduling for Construction – Best Practices and Guidelines
      • Understanding the Impact of Big Data Analytics on Business Performance
    • Software Systems
      • Planning Software
        • Artemis - 9000
        • Oracle - Primavera P3
        • Sciforma PSNext
        • Asta Powerproject
          • Critical Path DRAG
        • Safran Project
        • Safran for Microsoft Project
        • Safran Planner
        • Deltek - Open Plan
          • Help with Schedule Finish Dates
          • Setting up MultiProject Open Plan Professional
        • Microsoft Project
          • Adding Password to Microsoft Project File
          • Check if Project Saved as Baseline
          • 4D CONSTRUCTION SEQUENCING WITH SYNCHRO
          • Activity-on-Arrow Charts from MS Project
        • Oracle - Primavera P6 (formerly P4/P5)
        • Oracle - Primavera SureTrak
        • Artemis - Views
        • Oracle - Primavera P6 Web
        • CCS -Candy Planning / SitePlan
        • Asta Powerproject Enterprise
        • TILOS
        • sure trak
        • DynaRoad
        • ADePT Design Builder
        • Acumen Fuse
        • ATC Professional
        • eTaskMaker
        • Phoenix Project Manager
          • Streamline communications to the Project Team
        • ScheduleReader™
      • Risk Software
        • Oracle - Primavera Risk Analysis (formerly Pertmaster)
        • Intaver Institute RiskyProject
        • Strategic Thought - Active Risk Manager (ARM)
        • Deltek - WelcomRisk
        • Acumen Risk
      • Cost Software
        • Deltek - COBRA
        • Oracle - Primavera Earned Value Management
        • Kildrummy - CostMANAGER
        • CCS - Candy - Project Control Software
        • EcoSys - EPC (Enterprise Planning & Controls)
        • Cleopatra Enterprise (by Cost Engineering)
    • Website Help and FAQ
      • Email Issues
      • News Issues
      • Forum Posting Rules & Issues
      • Production Rates Issues
      • Groups Issues
      • Partners Issues
      • Consuls Issues
      • Jobs Issues
      • Voting & Polls Issues
      • Team Issues
      • Member Profile Issues
      • Site Newsletters
        • News: Friday 6th April 2012
        • News: Friday 27th April 2012
    • Building Information Modeling
      • BIM Software Application
        • BIM Tools - ( According to Georgia Tech)
        • Bentley
        • BIM Software
      • BIM Explained
        • Best Practice & Skills
          • Project Life Cycle
          • Issue Management
          • Stakeholder Management
          • Contract Management
            • Termination of the Contract
          • Interface Management
          • Cost Management
            • Comparsion of Cost Estimating Sottware and Techniques - From Spreadsheets to Today
            • The Most Overlooked Total Installed Cost (TIC) Items - An Integrated Consulting Article
          • Earned Value Management
            • EVM Utilized Effectively-An Integrated Consulting Article
          • Risk Management
            • Risk Identification
            • Risk Quantification
            • Risk Response
            • Risk Response Control
            • Managing Schedule Risks
            • Winning Risk Management
          • Change Management
          • Claims Management
            • Concurrent Delay
            • Delay & Disruption Protocol
            • The ‘notices’ provision in the Contract
            • Ownership of Float
          • Procedures & Processes
            • Constructability
            • The Values of Scheduling - An Integrated Consulting Article
            • The Values of Scheduling - An Integrated Consulting Article
          • Dispute Resolution
            • Arbitration
            • Litigation
            • Mediation
            • Adjudication
          • Project Partnering
          • SHEM - Safety, Health & Environment Management
          • White paper on resource management
          • Winning Project Management
        • 3D BIM Wiki
          • IFC File
          • Tekla 3D BIM Software
          • 3D Objects
        • 4D BIM Wiki
          • 4D Focus Time
          • Synchro 4D/5D BIM Software
        • 5D BIM Wiki
          • 5D BIM
        • 6D BIM Wiki
        • 7D BIM Wiki
          • 7D BIM
      • BIM Lobbying
      • BIM Specialist Registry
      • BIM Research
      • BIM Model Library
      • BIM Case Studies
        • Using Unmanned Aerial Vehicles for Automated BIM-based Construction Progress & Reporting
      • BIM and Project Controls
    • Building Information Modeling
      • BIM Software Application
        • BIM Tools - ( According to Georgia Tech)
        • Bentley
        • BIM Software
      • BIM Explained
        • Best Practice & Skills
          • Project Life Cycle
          • Issue Management
          • Stakeholder Management
          • Contract Management
            • Termination of the Contract
          • Interface Management
          • Cost Management
            • Comparsion of Cost Estimating Sottware and Techniques - From Spreadsheets to Today
            • The Most Overlooked Total Installed Cost (TIC) Items - An Integrated Consulting Article
          • Earned Value Management
            • EVM Utilized Effectively-An Integrated Consulting Article
          • Risk Management
            • Risk Identification
            • Risk Quantification
            • Risk Response
            • Risk Response Control
            • Managing Schedule Risks
            • Winning Risk Management
          • Change Management
          • Claims Management
            • Concurrent Delay
            • Delay & Disruption Protocol
            • The ‘notices’ provision in the Contract
            • Ownership of Float
          • Procedures & Processes
            • Constructability
            • The Values of Scheduling - An Integrated Consulting Article
            • The Values of Scheduling - An Integrated Consulting Article
          • Dispute Resolution
            • Arbitration
            • Litigation
            • Mediation
            • Adjudication
          • Project Partnering
          • SHEM - Safety, Health & Environment Management
          • White paper on resource management
          • Winning Project Management
        • 3D BIM Wiki
          • IFC File
          • Tekla 3D BIM Software
          • 3D Objects
        • 4D BIM Wiki
          • 4D Focus Time
          • Synchro 4D/5D BIM Software
        • 5D BIM Wiki
          • 5D BIM
        • 6D BIM Wiki
        • 7D BIM Wiki
          • 7D BIM
      • BIM Lobbying
      • BIM Specialist Registry
      • BIM Research
      • BIM Model Library
      • BIM Case Studies
        • Using Unmanned Aerial Vehicles for Automated BIM-based Construction Progress & Reporting
      • BIM and Project Controls
    • Miscellaneous
      • Delay Analysis
      • S Curve & Progress Tracking through Excel
      • Benefits of the Interdependent CPM Schedule Model
      • Notice Provisions Protect Contractors from Risk
      • Lean Construction Methods & CPM Scheduling Work Together
      • Primavera P6 Professional R16.2
      • Project Management - a philosophy of Life
        • Asset Life Cycle Management - Operations Management Vs. Capital Project Management
      • Modular Construction vs Traditional Construction, a Total Cost of Ownership Comparison of Data Centre Construction
      • Data Mining tool and techniques in construction by Knowledge Areas, state of the art situation
      • Project Management: Principles, Practices & Context
  • Production rates
    • Automotive
    • Bridges
    • Building & Construction
    • Building Services / E&M
    • Defence Sector
    • Fitout & Finishes
    • Health & Healthcare
    • IT Engineering Projects
    • Petrochemical Oil & Gas
    • Pharmaceutical
    • Power Generation & Nuclear
    • Roads & Infrastructure
    • Rule of Thumb
    • Shipbuilding
    • Transportation
    • Tunnelling & Mining
    • Water Management
  • Jobs
  • Advertisers
User account menu
  • Log in

TRICOM SYSTEMS (PHILS.)

Senior Project Engineer, TRICOM SYSTEMS (PHILS.), INC., Construction and Installation of numerous PABX System and Structured Cabling System across Philippines

Submitted by jluna8 on Tue, 2014-11-11 12:39
START Date
Sun, 09/01/1996 - 02:00
END Date
Mon, 05/01/2006 - 02:00
Experience Hours (Planning & Scheduling)
15250
Experience Hours (Cost Management)
9550
  • Read more about Senior Project Engineer, TRICOM SYSTEMS (PHILS.), INC., Construction and Installation of numerous PABX System and Structured Cabling System across Philippines
Subscribe to TRICOM SYSTEMS (PHILS.)

By logging in, inputting data or deciding to view any further of our pages you agree to be bound by our Forum Rules, our T&C’s and also our Privacy Policy © Planning Planet 2000-2025. Run by Project Controllers for Project Controllers.

Development by CodeLift AI