Subsea 7

Matthew Clarke

First Name: 
Matthew
Last Name: 
Clarke

Dear Sir/Madam,

Please find a copy of my CV with my corresponding online application.

I am seeking a new opportunity as a Project Planning Engineer.

Professional Since: 
Dec-2015 (8.4 yrs experience)
Oldest experience: 
Sep 2007 (16.7 yrs experience, WARNING: 8.2 years variance with Professional Since)
Years Experience: 
10

Engineer / Project Engineer, Subsea 7, Shell BC-10: BP Block 31; Exxon Mobil Saxi- Batuque

START Date: 
September, 2007
END Date: 
January, 2012
Substantial experience as a project engineer, that entailed similat activities as a project planner. 
  • Developed, planned and produced load-out and installation procedures of project assets.
  •  Managed equipment fabrication and product acceptance tests.
  •  Presented HIRAs, HAZOPs, Shift handover meetings, team updates & safety briefings.
  •  Managed drafting team to produce technical drawings & sketches.
  • &nbsp
Experience Hours (Planning & Scheduling): 
50
Experience Hours (Cost Management): 
50
Experience Hours (Forensic Analysis): 
0

Engineer / Project Engineer, Subsea 7, Shell BC-10: BP Block 31; Exxon Mobil Saxi- Batuque

START Date: 
September, 2007
END Date: 
January, 2012
  • Developed, planned and produced load-out and installation procedures of project assets.

•  Managed equipment fabrication and product acceptance tests.

•  Presented HIRAs, HAZOPs, Shift handover meetings, team updates & safety briefings.

•  Managed drafting team to produce technical drawings & sketches.

Experience Hours (Planning & Scheduling): 
50
Experience Hours (Cost Management): 
50
Experience Hours (Forensic Analysis): 
0

Global Planning Lead, Subsea 7, Associate Program & Global Planning Integration

START Date: 
January, 2013
END Date: 
April, 2013

Additional role based on acknowledgement as Planning Subject Matter Expert status

Peer & Stakeholder Management role

Setting up Global Processes, allowing affliates to work to same standard, but within their own "comfort zone"

Designing an associate training program ("planning apprenticeship") robust enough to be repeatable Globally, using local trainers

Experience Hours (Planning & Scheduling): 
250
Experience Hours (Cost Management): 
250
Experience Hours (Forensic Analysis): 
200

UK Project Controls Deputy Manager, Subsea 7, All Projects & Tenders

START Date: 
January, 2012
END Date: 
April, 2013

Additional role due to exceptional performance in first four months
Assist PCM in designing functional vision, strategy & tactics
Integrate capacity management system across the function
Deputise for PCM
Recognised Subject Matter Expert for Learning & Development within PC function
Lead drive to educate the business in the value of Project Controls
Integrate all PC improvement drives into coherent whole 

Experience Hours (Planning & Scheduling): 
700
Experience Hours (Cost Management): 
700
Experience Hours (Forensic Analysis): 
200

UK & Canada Project Risk & Opportunity Manager, Subsea 7, All Projects & Tenders

START Date: 
January, 2012
END Date: 
December, 2012

Additional role due to exceptional performance in first four months
Line Management responsibility for four staff
Introduce, design & run new apprentice risk analyst program
Raise profile of PROM internally
Raise Client perception of PROM competence
Produce and embed local WIs to compliment global procedures
Assist Global PROM Manager in setting processes, procedures & standards 

Mentor Lead Risk Engineer to take over running of function

Experience Hours (Forensic Analysis): 
1000

UK & Canada Planning Manager, Subsea 7, All UK & Canada Projects & Tenders

START Date: 
August, 2011
END Date: 
April, 2013

Line Management responsibility for twenty staff (at trainee, planner, senior & principle levels)
Redesign shape and personnel of planning department to meet current & future business requirements
Introduce, design & run new apprentice planner program
Raise profile of planning internally
Raise Client perception of planning competence
Produce and embed Standard Operating Procedure to planning
Produce and embed Planning Book of Knowledge for business

Experience Hours (Planning & Scheduling): 
3050
Experience Hours (Cost Management): 
1150

Kenneth Barr

First Name: 
Kenneth
Last Name: 
Barr

I am currently working with Subsea 7 as a Senior Planning Analyst based in Aberdeen. I have been with Subsea 7 since the 1stSeptember 2008, prior to this I was employed with RBG Ltd as an ‘International Marketing Analyst’.

I have experience in commercial, business and planning analysis, strategic planning, strategy implementation and market analysis.

Over the past five years I have complimented my academic knowledge with practical experience in the upstream oil and gas industry.

Professional Since: 
Apr-2007 (17.1 yrs experience)
Oldest experience: 
Apr 2007 (17.1 yrs experience)
Years Experience: 
5

Global Business Analyst, Subsea 7, Role covers Subsea 7 at group wide level

START Date: 
September, 2008
END Date: 
May, 2012

Subsea 7 – Aberdeen, UK                                                                                            Septe

Senior Planning Analyst, Subsea 7, Role covers entire fleet of vessels

START Date: 
May, 2012

Subsea 7 – Aberdeen, UK                                                                                               &n

Market Place