EPS Deputy Manager, PROMAN ec, Several / Sarir,// H2 Pilot plant in Carregado, etc

START Date: 
August, 2018
END Date: 
August, 2022

EPC Deputy Manager and Planning Manager

Responsible for all projects coordination as delegated by the EPC department manager.

Leading a team of planner in several projects in all phases (offer, detail, execution, closing) .

Projects ranging from Oil and Gas to Power plants, Hidrogen, etc.

 

Projects location in Canada, Portugal, Lybia, however managed from Lisbon (Portugal)

Experience Hours (Planning & Scheduling): 
2200
Experience Hours (Cost Management): 
6050
Experience Hours (Forensic Analysis): 
800

EPS Deputy Manager, PROMAN ec, Several / Sarir,// H2 Pilot plant in Carregado, etc

START Date: 
August, 2018
END Date: 
August, 2022

EPC Deputy Manager and Planning Manager

Responsible for all projects coordination as delegated by the EPC department manager.

Leading a team of planner in several projects in all phases (offer, detail, execution, closing) .

Projects ranging from Oil and Gas to Power plants, Hidrogen, etc.

 

Projects location in Canada, Portugal, Lybia, however managed from Lisbon (Portugal)

Experience Hours (Planning & Scheduling): 
2200
Experience Hours (Cost Management): 
6050
Experience Hours (Forensic Analysis): 
800

EPS Deputy Manager, PROMAN ec, Several / Sarir,// H2 Pilot plant in Carregado, etc

START Date: 
August, 2018
END Date: 
August, 2022

EPC Deputy Manager and Planning Manager

Responsible for all projects coordination as delegated by the EPC department manager.

Leading a team of planner in several projects in all phases (offer, detail, execution, closing) .

Projects ranging from Oil and Gas to Power plants, Hidrogen, etc.

 

Projects location in Canada, Portugal, Lybia, however managed from Lisbon (Portugal)

Experience Hours (Planning & Scheduling): 
2200
Experience Hours (Cost Management): 
6050
Experience Hours (Forensic Analysis): 
800

Project Planner, Lodas Construction, Kamoa Copper Project

START Date: 
August, 2015
Develop and maintain detailed resource loaded schedules and provide weekly schedule updates. Integrate multiple schedules into a master project schedule, baseline, status and perform measurement baselines. Develop and maintain summary level schedule reports, Gantt, Milestones, Charts, Histograms and S-Curves and other tools used to support critical path analysis, near task work, priority-based resource allocations, performance variances and to support cost/schedule integration. Gather and analyze information
Experience Hours (Planning & Scheduling): 
28800
Experience Hours (Cost Management): 
0
Experience Hours (Forensic Analysis): 
6250

Engineer / Project Engineer, FCS Group LLC, Commercial, Bridges & Tunnel Construction

START Date: 
September, 2020
END Date: 
January, 2022
  • Reviewing preliminary construction drawings such as, architectural, and structural drawings, and identifying the scope of work by reviewing specifications and attending walkthroughs on work sites.
  • To estimate and manage civil and engineering projects, primarily in the industrial and commercial infrastructure sector.
  • Performing accurate quantity takeoffs using Bluebeam software and creating a cost estimation of the projects based on scope of work.
  • Responsible to analyze client requirements, develop estimates and proposals and lead final negotiations.
  • Work
Experience Hours (Planning & Scheduling): 
4100
Experience Hours (Cost Management): 
5000
Experience Hours (Forensic Analysis): 
150

Project Controls Manager, SEPCO, King Salman International Complex for Maritime Industries and Services Project

START Date: 
September, 2018

Project Controls Manager for King Salman International Complex for Maritime Industries and Services Project 

Experience Hours (Planning & Scheduling): 
1500
Experience Hours (Cost Management): 
750
Experience Hours (Forensic Analysis): 
250

Jr. Planning engineer, CCC (Consolidated Contractors Company), Carnegie Mellon University

START Date: 
November, 2007
END Date: 
October, 2009
  • Preparing daily, weekly and monthly reports.
  • Creating client reports, charts, curves and delivery of progress presentations.
  • Assisting in preparation of project invoices and payment applications with supporting schedules and reports.
  • Monitoring of subcontractors’ progress and guidance with report submittals for compatibility with in-house monitoring systems.

Project & Corporate Planning Manager, NNPC - Brass LNG, Brass Liquefied Natural Gas Project (Brass LNG)

START Date: 
April, 2016
END Date: 
August, 2017

Position: Project Manager & Corporate Planning Manager Brass LNG Project

(Apr 2016 – Aug 2017)

As the Managing Director’s direct report, my duties and responsibilities included:

Experience Hours (Planning & Scheduling): 
1500
Experience Hours (Cost Management): 
1000

PMO Planning and Reporting Manager, Pioneer Foods, SAP Implementation

START Date: 
March, 2019
  • Built the program planning structure including, workstreams schedules with interdependencies and integrated plan for SAP S/4 HANA solution implementation and relevant dependency projects.
  • Provided reporting framework for the SAP program and contributed in developing governance model of the projects including deliverables, resources, benefits, risk, issue, actions, decisions and changes registry, tracking and monitoring, phase gate QA and EV based progress measurement.
  • Implemented Microsoft PPM solution to manage the Group IT portfolio and cohesively reporting in the Pow

Senior Planning and Scheduling Engineer, Exyte Malaysia, First Solar KMT-2 Project

START Date: 
November, 2017
Projects: 1. First Solar KMT-2 Project – First Solar, Kulim Plant. Design and modification of Module 3 & 4 to suite production upgrade from series 4 to series 6 solar panels. 2. First Solar KMT-1 CDA Expansion Project – First Solar, Kulim Plant Design and modification of CDA System to suite newly ugraded VTD coater requirements. 3. VerdePalm Project – Verdezyne, Johor Malaysia EPCC of civil, structural, architectural, mechanical, electrical, controls and instrumentation.
Experience Hours (Planning & Scheduling): 