David Wileman

First Name: 
David
Last Name: 
Wileman

Planning Expert / Forensic Planner / Project Monitoring Specialist providing dispute prevention, avoidance & resolution to global construction clients.

EXPERT COMMISSIONS (including, but not limited to:)

Appointed as a planning and delay expert on a dispute involving the conversion of a bulk carrier into the World’s largest Pipe Laying Vessel. Instructed to provide an independent assessment of issues in relation to the planning systems / data and the causes of critical delay;

Appointed as planning and delay expert on a dispute involving the construction of a Reverse Osmosis Desalination Facility. Instructed to provide an independent assessment of the causes of critical delay to the Project;

Appointed as planning and delay expert on a $500 million Jack Up Drilling Rig dispute for a Far Eastern contractor against an oil rig operator. Instructed to provide an independent assessment of the causes of critical delay to the Project;

Appointed as delay expert on an onshore facility upgrade. Instructed to provide an independent assessment of causes of critical delay and productivity loss;

Appointed as a planning and delay expert on a Major University Campus dispute involving a major building contractor and University College. Instructed to provide an independent assessment of the entitlement to delay as a consequence of specific issues.

FPSO VESSEL CONVERSION PROJECTS

Talisman Project - Fabrication and installation of new facilities to the topsides of an FPSO;
Conoco Banff FPSO. The fabrication and installation of turret and topsides into a new build hull;
Shell Anasuria FPSO – Installation of 3000 tonne topside facilities and 3000 tonne turret.


OIL FACILITY CONSTRUCTION PROJECTS

Statoil Gullfaks C Project for the integration of new facilities into an existing platform;
BP ETAP – Construction of two sections (14,000 tonne combined weight) of an integrated deck;
Phillips Petroleum UK Ltd Judy / Joanne Project – Construction of 9000 tonne integrated deck;  

Professional Since: 
Sep-1989 (34.6 yrs experience)
Oldest experience: 
Jun 2002 (21.9 yrs experience, WARNING: 12.7 years variance with Professional Since)
Years Experience: 
42