The Six-Point Checklist for NEC3 Programmes

The Six-Point Checklist for NEC3 Programmes

By Roger Gibson

  1. Does the programme comply with the contractual obligations?
  2. Work activity durations and content
  3. Logic relationships/links
  4. Network constraints
  5. Scheduling criteria and results
  6. Critical path and near-critical paths