But for just reporting at a level 2 from a level 3 or level 4 plan, then this does what you need? Or what is the difference between what p3e/c does and the old summarise option in P3 (except the fact its 1000 times faster!)
Data rolls up to Activity Code level automatically. You just need to open the projects then group by those activity / project codes.