Primavera Project Planner - P3 RE: Percent weight in Primavera P3 S-curve hi you need to assign a resource, "call it manhour for simplification" to your program, lets say the total budget quantity for your program will be 100 Hours. thus : Engineering = 25 hour Procurement/Fab = 15 hour Construction = 55 hour Commissioning = 5 hour HTH Log in or register to post comments
RE: Percent weight in Primavera P3 S-curve hi you need to assign a resource, "call it manhour for simplification" to your program, lets say the total budget quantity for your program will be 100 Hours. thus : Engineering = 25 hour Procurement/Fab = 15 hour Construction = 55 hour Commissioning = 5 hour HTH
RE: Percent weight in Primavera P3 S-curve
hi
you need to assign a resource, "call it manhour for simplification" to your program,
lets say the total budget quantity for your program will be 100 Hours. thus :
Engineering = 25 hour
Procurement/Fab = 15 hour
Construction = 55 hour
Commissioning = 5 hour
HTH