NOTE : THERE WAS AN ERROR DURING THE SAVING / SENDING OF MY REPLY - THE REPLY PAGE WAS NOT SAVING AND ASKING ME TO RELOAD THE PAGE - I RELOADED THE PAGE 3 TIMES WITH THE EXPECTATION THAT FINALLY IT WILL SAVE MY REPLY - TILL THE END THE PAGE DID NOT SAVE - BUT WHEN I OPENED THIS PAGE FROM THE LINK WHICH HAS BEEN SENT TO MY E-MAIL , IT SHOWS THAT MY REPLY HAS BEEN POSTED 3 TIMES.
NOTE : THERE WAS AN ERROR DURING THE SAVING / SENDING OF MY REPLY - THE REPLY PAGE WAS NOT SAVING AND ASKING ME TO RELOAD THE PAGE - I RELOADED THE PAGE 3 TIMES WITH THE EXPECTATION THAT FINALLY IT WILL SAVE MY REPLY - TILL THE END THE PAGE DID NOT SAVE - BUT WHEN I OPENED THIS PAGE FROM THE LINK WHICH HAS BEEN SENT TO MY E-MAIL , IT SHOWS THAT MY REPLY HAS BEEN POSTED 3 TIMES.
NOTE : THERE WAS AN ERROR DURING THE SAVING / SENDING OF MY REPLY - THE REPLY PAGE WAS NOT SAVING AND ASKING ME TO RELOAD THE PAGE - I RELOADED THE PAGE 3 TIMES WITH THE EXPECTATION THAT FINALLY IT WILL SAVE MY REPLY - TILL THE END THE PAGE DID NOT SAVE - BUT WHEN I OPENED THIS PAGE FROM THE LINK WHICH HAS BEEN SENT TO MY E-MAIL , IT SHOWS THAT MY REPLY HAS BEEN POSTED 3 TIMES.
Thanks for your reply. I tried your suggestion i.e. I changed both the file name and its location too and then in "Database Configuration" I selected "Add a connection to an existing standalone database" with the new path and new file name selected. The Connection is successful (as before), but during login and subsequent opening it gives the same error (as before - Specified and illustrated in my question above).
Thanks for your reply. I tried your suggestion i.e. I changed both the file name and its location too and then in "Database Configuration" I selected "Add a connection to an existing standalone database" with the new path and new file name selected. The Connection is successful (as before), but during login and subsequent opening it gives the same error (as before - Specified and illustrated in my question above).
Thanks for your reply. I tried your suggestion i.e. I changed both the file name and its location too and then in "Database Configuration" I selected "Add a connection to an existing standalone database" with the new path and new file name selected. The Connection is successful (as before), but during login and subsequent opening it gives the same error (as before - Specified and illustrated in my question above).
With Thanks & Best Regard,
Vikas Kulkarni.
Member for
19 years
Member for19 years
Submitted by Rodel Marasigan on Tue, 2023-07-18 05:08
Attempt to copy the SQLite database and rename it with another SQLite database name. Afterward, try opening the copied SQLite database, and it should upgrade to the later version. Sometimes, the cache may still reside on your system, preventing the database from being released.
Member for
5 years 8 monthsDear Mr. Rodel Marasigan,As
Dear Mr. Rodel Marasigan,
As suggested by you - "Running / Opening P6 as an Administrator" solved the issue - THE SQLITE DATABASE WAS UPGRADED PERFECTLY"
With Thanks & Best Regards,
Mr. Vikas Kulkarni.
Member for
19 yearsWhen you run P6, instead of
When you run P6, instead of double-clicking the icon, right-click and select 'Run as Administrator.' This will give you full access to your database.
Member for
5 years 8 monthsNOTE : THERE WAS AN ERROR
NOTE : THERE WAS AN ERROR DURING THE SAVING / SENDING OF MY REPLY - THE REPLY PAGE WAS NOT SAVING AND ASKING ME TO RELOAD THE PAGE - I RELOADED THE PAGE 3 TIMES WITH THE EXPECTATION THAT FINALLY IT WILL SAVE MY REPLY - TILL THE END THE PAGE DID NOT SAVE - BUT WHEN I OPENED THIS PAGE FROM THE LINK WHICH HAS BEEN SENT TO MY E-MAIL , IT SHOWS THAT MY REPLY HAS BEEN POSTED 3 TIMES.
Member for
5 years 8 monthsNOTE : THERE WAS AN ERROR
NOTE : THERE WAS AN ERROR DURING THE SAVING / SENDING OF MY REPLY - THE REPLY PAGE WAS NOT SAVING AND ASKING ME TO RELOAD THE PAGE - I RELOADED THE PAGE 3 TIMES WITH THE EXPECTATION THAT FINALLY IT WILL SAVE MY REPLY - TILL THE END THE PAGE DID NOT SAVE - BUT WHEN I OPENED THIS PAGE FROM THE LINK WHICH HAS BEEN SENT TO MY E-MAIL , IT SHOWS THAT MY REPLY HAS BEEN POSTED 3 TIMES.
Member for
5 years 8 monthsNOTE : THERE WAS AN ERROR
NOTE : THERE WAS AN ERROR DURING THE SAVING / SENDING OF MY REPLY - THE REPLY PAGE WAS NOT SAVING AND ASKING ME TO RELOAD THE PAGE - I RELOADED THE PAGE 3 TIMES WITH THE EXPECTATION THAT FINALLY IT WILL SAVE MY REPLY - TILL THE END THE PAGE DID NOT SAVE - BUT WHEN I OPENED THIS PAGE FROM THE LINK WHICH HAS BEEN SENT TO MY E-MAIL , IT SHOWS THAT MY REPLY HAS BEEN POSTED 3 TIMES.
Member for
5 years 8 monthsDear Mr. Rodel
Dear Mr. Rodel Marasigan,
Thanks for your reply. I tried your suggestion i.e. I changed both the file name and its location too and then in "Database Configuration" I selected "Add a connection to an existing standalone database" with the new path and new file name selected. The Connection is successful (as before), but during login and subsequent opening it gives the same error (as before - Specified and illustrated in my question above).
With Thanks & Best Regard,
Vikas Kulkarni.
Member for
5 years 8 monthsDear Mr. Rodel
Dear Mr. Rodel Marasigan,
Thanks for your reply. I tried your suggestion i.e. I changed both the file name and its location too and then in "Database Configuration" I selected "Add a connection to an existing standalone database" with the new path and new file name selected. The Connection is successful (as before), but during login and subsequent opening it gives the same error (as before - Specified and illustrated in my question above).
With Thanks & Best Regard,
Vikas Kulkarni.
Member for
5 years 8 monthsDear Mr. Rodel
Dear Mr. Rodel Marasigan,
Thanks for your reply. I tried your suggestion i.e. I changed both the file name and its location too and then in "Database Configuration" I selected "Add a connection to an existing standalone database" with the new path and new file name selected. The Connection is successful (as before), but during login and subsequent opening it gives the same error (as before - Specified and illustrated in my question above).
With Thanks & Best Regard,
Vikas Kulkarni.
Member for
19 yearsAttempt to copy the SQLite
Attempt to copy the SQLite database and rename it with another SQLite database name. Afterward, try opening the copied SQLite database, and it should upgrade to the later version. Sometimes, the cache may still reside on your system, preventing the database from being released.