Guild of Project Controls: Compendium | Roles | Assessment | Certifications | Membership

Turkey (AS.TR)

Görkem ŞAHİN

First Name: 
Görkem
Last Name: 
ŞAHİN

-                     Preparing CapacityPlans

-                     Preparing Main Building/Production Plan

-                     Preparing MilestonePlan

Professional Since: 
Nov-2012 (10.2 yrs experience)
Oldest experience: 
Nov 2012 (10.2 yrs experience)
Years Experience: 
4

Planning Responsible, Tersan Shipyard Industry and Trade Inc., 1x 3000Cbm Live Fish Carrier - 1x 128m Offshore Construction and IMR Vessel - 1x 60m Freezer Trawler - 3x 80m Freezer Trawler - 1x 5700 DWT Chemical/Oil Carrier - 2x 106m Ro-Ro Passenger and V

START Date: 
December, 2014
END Date: 
December, 2016

-                     Preparing Main Building Plan

-                     Preparing Milestone Plan

-                     Preparing Detailed Design/Production/Purchasing Plan

Experience Hours (Planning & Scheduling): 
3000
Experience Hours (Cost Management): 
1000
Experience Hours (Forensic Analysis): 
50

Planning Engineer, UZMAR Shipbuilding Industry and Trade Inc., 3x ASD3280 Tug Boat - 1x AVT3060 Voith Water Tractor Tug - 1x T1200 Mooring Boat - 3x ASD3070 Tug Boat - 8x SDP4600 Push Boat - 6x TS2019 Mooring Boat - 2x ASD2560 Tug Boat - 2x TS2030 Tug Boa

START Date: 
November, 2012
END Date: 
November, 2014

-                     Preparing Capacity Plans

-                     Preparing Main Building Plan

-                     Preparing Milestone Plan

Experience Hours (Planning & Scheduling): 
3000
Experience Hours (Cost Management): 
1000
Experience Hours (Forensic Analysis): 
50

Vladimir Gusev

First Name: 
Vladimir
Last Name: 
Gusev

As Mechanical engineer in nuclear power plant through the all life cycles (construction, operation, decommissioning) I have got robust knowledge and experience in Operation, Supervision, Reliability maintenance, Projects management and relevant business applications based on Enterprise Assets Management standard.  As a group leader of a small sub-projects my responsibility comprised delivering of   a few new business procedures based on IFS Application software for energy industry, Nuclear decommissioning management system, Primavera P6, other to

Professional Since: 
Dec-2007 (15.2 yrs experience)
Oldest experience: 
Nov 2007 (15.2 yrs experience, WARNING: 0.1 years variance with Professional Since)
Years Experience: 
7

Head of planning and reporting group, AKKUYU NÜKLEER ANONİM ŞİRKETİ, Akkuyu nuclear power plant

START Date: 
May, 2014

The space of developing:

  • WBS of NPP AKKUYU Project description developing,
  • Basic planning and control procedure developing,
  • Directive schedule follow-up,
  • Licence schedule developing and follow-up on 1 and 2 level,
  • Integrated schedule of preparation period follow-up on level 2
  • Monthly project status-report preparation.
  • Separate chapters of Licensing plan preparation
Experience Hours (Planning & Scheduling): 
2700
Experience Hours (Cost Management): 
0
Experience Hours (Forensic Analysis): 
0

Seyfettin ER

First Name: 
Seyfettin
Last Name: 
ER
Professional Since: 
Sep-1962 (60.4 yrs experience)
Years Experience: 
0

Simultaneous Translator, Gama Industries, Cement Factory Construction, Ankara, Turkey

START Date: 
June, 1992
END Date: 
July, 1992

Simultaneous Translator.

I was the simultaneous translator for two Frenchmen temporarily assigned to supervise the first ever locally constructed rotary oven of a cement factory in Ankara.

Simultaneous translation basically between French & Turkish with management and workers and French and English when English speakers connected with the Frenchmen.

This got me interested in Industrial Projects. :)

Acting Control Engineer, Atilla Doğan A.Ş., Natural Gas Network Installation Project, Ankara, Turkey

START Date: 
May, 1996
END Date: 
August, 1997
1996 – 1997 (Summer break) Atilla Doğan A.Ş. Ankara/TURKEYInternship, acting Control Engineer for the client. (Quality control of subcontractors work for a duration of 13 weeks)Project details: Work consisted of the installation of underground urban natural gas lines throughout the city of Ankara /Turkey (central lines including thousands of building connections).

Researcher, HELP International Inc., Generic

START Date: 
October, 1999
END Date: 
December, 2000

Resident Computer Expert (Database Management, Local Network Administration)

●      Local area network admin, Database entry,

●      Data search & retrieval from the Internet as required by company area of activity.

Technical Office Engineer, Planning, Cost Control, Atilla İnş. Tur. ve Tic. A.Ş., Multiple (9) Projects, Ankara, Turkey

START Date: 
April, 2001
END Date: 
January, 2003

Technical Office. Infrastructure work monthly due reports(İller Bank), Biding Dossiers, Price Assessments.

Project details:Works consisting of the construction of the foul water and rainwater systems for various small cities.

●      Monthly due reports for various construction sites (nine sites at peak, minimum 5 sites).

●      Follow-up (seek approval) on location of two site due reports with client.

Market Place

Primavera P6 and Microsoft Project books, on-line video training courses and training material available from an internationally recognised publisher and PMI accredited REP. Teach yourself using on-line or book based learning or run your own in-house or public PMI accredited courses.
Syndicate content