Turkey (AS.TR)

Planner, TEKFEN, Oil and Gas

START Date: 
January, 2012

Planning and reporting of superstructure, infrastructure, oil and gas sector in international projects.

Planner, TEKFEN, Oil and Gas

START Date: 
January, 2012

Planning and reporting of superstructure, infrastructure, oil and gas sector in international projects.

Ali Utku Topak

First Name: 
Ali Utku
Last Name: 
Topak
Oldest experience: 
Jan 2012 (13.4 yrs experience, WARNING: 42.0 years variance with Professional Since)
Years Experience: 
43

Planner, TEKFEN, Oil and Gas

START Date: 
January, 2012

Planning and reporting of superstructure, infrastructure, oil and gas sector in international projects.

Planner, TEKFEN, Oil Field

START Date: 
January, 2012
END Date: 
July, 2013

Plannig and reporting of  Tank, FL, MNF, Infrastructure international projects.

sads, dsa, sdasa

START Date: 
July, 2013
END Date: 
January, 2010

aasfdasdsafasfas fdsafdsf fwasfs fsafs fsaf s fdsa fs fds  fsa f 

Assistant Planner or Junior Planner, EKGYO, Shopping Mall

START Date: 
June, 2010

Emlak REIT (the biggest reit company in Turkey). I worked as a field engineer and technical office chef at Merkez Kayaşehir, which is the first and only shopping center of Kayaşehir referred as the largest satellite city of Turkey and Europe. I controlled qualities of productions at construction field. I helped coordination of subcontractors at the field. I prepared payment of subcontractors. I planned construction works via MS Project. I translated technical documents about Hilton Hotel. I follow certifications of materials which is used in construction..

 

Senior Planning Engineer, Hill International, Luxurious Housing Project

START Date: 
June, 2014
END Date: 
July, 2016
I was working as a planning engineer in mix used project with 8 blocks of residential with 1401 residences and 1block of hotel. Project name is Sea Pearl Ataköy. I controlled work schedules and plans of two phases of the projectwith Primavera P6. Detailed time plans and work schedules were being conducted with main contractor and control company. Estimated project revenue was 2.8 billion dollars from this project. This project has approximately 600000square meters construction area.

Planning Engineer, STFA, All Projects

START Date: 
April, 2013

-          Preparing of work schedules

-          Preparing of budget of possible projects and revising of budgets of ongoing projects

-          Preparing of Cost Control Structure of Projects

-          Creating of Cost Control Structure to SAP System

Planning and QA/QC Engineer, Teknik Rasyonel Yapı, Marmaray BC1 Project

START Date: 
June, 2012
END Date: 
April, 2013

-          Planning the working schedule

-          Preparing daily, weekly, and progress reports

-          Preparing the Method Statements and Material Submittals

-          PreparingtheMaterialReceivingInspectionReportsandWorkInspectionReports