Guild of Project Controls: Compendium | Roles | Assessment | Certifications | Membership

PIPELINES

Senior Planning Engineer, Leighton Contracting Qatar, Construction of Reservoirs, Micro-tunneling, PIPELINES, Pumping Stations

START Date: 
September, 2009
END Date: 
February, 2020

-Reporting to Project Director

-Prepare tender programme

-Prepare key productivity indicator (KPI)

-Prepare monthly reports

-Prepare extension of time (EOT)

-Review reports

Scheduler, APA-Group, Pipelines, Compressor Stations, Meter Station

START Date: 
July, 2008

Having about 6 years experience in Planning/Scheduling.I'm fully familiar with all activities in any phase of EPC.Fully undrestanding of enginieering activities sequences and documents.knowing the proccess of procurement and scheduling & expediting its activities so that preventing delays in construction and erections activities.
------------------------------------------------------------------------------------
Skills&Capabilities

•Knowledge of Engineering, Procurement, Construction, Management (EPCM) projects.
•Project planning across several disciplines: Civ

Head of Planning and Scheduling, Technip Germany GmbH, Calciner, Gas Storage Facilities, PIPELINES, Revamp of Chemical Plant

START Date: 
October, 2011
END Date: 
June, 2015

Plan and Schedule projects in oil &gas area: Mainly gas storage facilities and pipelines;

Lead planner for the revamp of a chemical plant

Manage a team of Planners and Schedulers

Experience Hours (Planning & Scheduling): 
7000
Experience Hours (Cost Management): 
500
Experience Hours (Forensic Analysis): 
200

Planning Engineer (Lead), Harough/Petro Canada Oil Operations, Tripoli, Libya, Develops and produces petroleum from Oil Fields (Infrastructures, Oil well drilling, Pipelines, crude tanks, surge tank closed drain tank, ring foundations and Power Plants).

START Date: 
April, 1980

 

  • I have more than 31 years professional experience (21 years in overseas and 10 years in India) in the following areas 9 years in field. 6 years Design and 16 years in Project Management/Project Controls with Owners, Consultants and Contractors on Multidisciplinary International Projects with different sectors. I have worked as Project Manager, Construction Manager, Project Controls Manager (acting), Senior Planning/Scheduling Engineer and Principal Scheduler (Team Leader).

 

SENIOR PLANNER, Engineers India Limited, GNL-2K, PIPELINES, CRACKER & POLYMER PROJECTS, REFINERY EXPENSION,SHUTDOWN PLANNING & EXECUTION,NAPHTHA CRACKER PROJECTS

START Date: 
July, 2003
 
PROFESSIONAL EXPERIENCE

 

Total Experience:      7.7 Years, out of which 2.0 years in Engineers India Limited.
 
 
CAREER SUMMARY

 

Over 7 years of experience in Project Planning & Monitoring  at Home Office and Construction sites in India for Heater Package, Delayed Coker Unit and Cross country Pipelines

Senior Cost Engineer, Senior Planner, Project Controls Manager, Project Controls Management Services Pty Ltd, Buildings, Industrial, Oil & Gas, Petro Chem, Pharmaceutical, PIPELINES, Rails, Refinery

START Date: 
June, 1981

Had over 20 years in the construction industry of combined working experience in the field of oil & gas refinery, pharmaceutical plant, waste water treatment & recycle water treatment plant, high rise building, module assembly, on-shore pipeline installation, power plant, industrial plant  and heavy civil infrastructure.

Market Place

Primavera P6 and Microsoft Project books, on-line video training courses and training material available from an internationally recognised publisher. Teach yourself using on-line or book based learning or run your own in-house or public courses.
Syndicate content