Guild of Project Controls: Compendium | Roles | Assessment | Certifications | Membership

Office Engineer

Construction Inspector, Office Engineer, Alexander Potter & Associates / Camp Dresser & McKee, City of Baltimore

START Date: 
September, 1974
END Date: 
March, 1979

I served as Office Engineer and Construction Inspector on Patapsco Wastewater Treatment Plant expansion program, worth $100 million plus.  Program consisted of expansion of wastewater treatment facilioty to 70 mgd.  Maintained field records for inspection and equipment documentation.  Inspected offsite utility contract and onsite pile-driving operations.

Office Engineer, SR Constructions, 1-buildings 2-Infrastructure

START Date: 
May, 2002
END Date: 
May, 2005
  • Plans prepared for Residential Apartments & Commercial Buildings as per the client requirements.
  • Structural Analysis & Design of Concrete Frames, Slabs &Footings using STAAD Pro
  • Estimation of Materials required for the Buildings and Client Billing.
Experience Hours (Planning & Scheduling): 
0
Experience Hours (Cost Management): 
500
Experience Hours (Forensic Analysis): 
0

Field Engineer, Office Engineer, Chief Field Engineer, PRoject Scheduler, Dravo Constructors, Inc., Iron Oxide Facilty, Decoking Facility, Steel Mill, Geothermal Power Plan, Waste-to -Engergy Power Plan

START Date: 
January, 1980
END Date: 
September, 1987

Field Engineer - Piping field engineer responsible to manage material flow through the warehouse

Office Engineer - supported chief field engineer on various dutues

Project Scheduler - developed, monitored and forecasted proejct schedules, developed monthly report

Office Engineer, MEAR GROUP Incorporated, Varied projects: Buildings & Fit-outs, and Housing projects

START Date: 
June, 2000
END Date: 
February, 2001

Responsibilities involve planning & scheduling, Tender document/requirement preparation, quantity take-off and cost estimating, project budget preparation, progress reporting and billing, site checking and coordination.

Office Engineer, Al Rajhi Contruction L.L.C., National Water Company Riyadh

START Date: 
August, 2011

Offloading Pipe 6m length: 14 Nos. /hr with crane & 4 labours 

Market Place

Primavera P6 and Microsoft Project books, on-line video training courses and training material available from an internationally recognised publisher. Teach yourself using on-line or book based learning or run your own in-house or public courses.
Syndicate content