START Date: 
                    November, 2016         
         
 
This role is to coordinate and maintain the engineering Construction Interface 
tracker which is the main multi discipline focal point document for the engineering 
team in Farnborough, Almaty and Houston with the construction site in Tengiz, 
Kazakhstan.
To maintain good communication between all WBS areas, existing area meetings were 
enhansed with additional meetings so that the tracker was up to date and all changes visable for discussion in the weekly review meeting by management and lead engineers.
	
Any slippages within the multiple P6 schedules had to be challenged by liaising