Roads / Tunnel / Bridge

Senior Engineer, Simplex Infrastructures Limited, Flyover Project

START Date: 
March, 2010
END Date: 
April, 2011
• Managed all activities in a timely manner including delivering study of drawing, scope and work specifications, preparation of base line schedule for the project and accurate updating of the project schedule • Created and implemented all functional schedules and S Curves in relation to Engg, procurement, construction and overall S Curve • Robustly delivered sale value calculations monthly for month-wise planned quantity as well as managing cost to completion, schedule of material requirement, employee requirements, labour needs and P&M requirements
Experience Hours (Planning & Scheduling): 
1000
Experience Hours (Cost Management): 
250
Experience Hours (Forensic Analysis): 
900

Planning Engineer, PORR Qatar Construction WLL, Tendering of Projects

START Date: 
May, 2015
END Date: 
August, 2017
• Delivered planning expertise including effective preparation of the project master programme that encompassed project phasing involving design, procurement, construction, commissioning and handover • Identified and developed robust and cost effective project construction and engineering methods • Developed and implemented a project timescale, ensuring full achievement of all deadlines as well as introducing program and target milestones across all phases and in line with the project execution plan • Built and developed key partnerships with the client, contractors, consultants and the
Experience Hours (Planning & Scheduling): 
4000
Experience Hours (Cost Management): 
100
Experience Hours (Forensic Analysis): 
500

Peter Stefanik

First Name: 
Peter
Last Name: 
Stefanik
Professional Since: 
May-2010 (10.3 yrs experience)
Oldest experience: 
Jun 2010 (10.2 yrs experience, WARNING: 0.1 years variance with Professional Since)
Years Experience: 
10

Senior Planning Engineer

Show Until: 
Mon, 2020-08-31

Jobs in Planning – Freelance / Contract

 

  • Location: London  
  • 6 Month rolling contract
  • Immediate start
  • Roads & Infrastructure
  • ASTA Power Project
  • £400 per day (Negotiable)

 

We need a senior planning engineer with solid civil, roads & infrastructure experience to help our client for on a 6 month rolling contract in London. Please contact me for a confidential conversation.

 

Get in touch with me of you are interested, CVs first phone call second !

 

Salary: 
£400 +

Sr Panning Engineer, assafco , (c) construction of road, 400 Bed Hospital

START Date: 
June, 2013
END Date: 
March, 2015
  • Prepare Project Planning Dossier including Project Control Procedure, Project Baseline Schedule, Deliverable Register, S Curve and Histogram.
  •  Developing and implementing standard project controls practices including scheduling manual, reporting manual, forms, templates, EPS, WBS, etc...
  •  Developing detailed daily, weekly, and monthly project progress reports and submit to client
  • submitting extension of time claims and prolongation cost
Experience Hours (Planning & Scheduling): 
2600
Experience Hours (Cost Management): 
2550
Experience Hours (Forensic Analysis): 
2400

Sr Panning Engineer, assafco , (c) construction of road, 400 Bed Hospital

START Date: 
June, 2013
END Date: 
March, 2015
  • Prepare Project Planning Dossier including Project Control Procedure, Project Baseline Schedule, Deliverable Register, S Curve and Histogram.
  •  Developing and implementing standard project controls practices including scheduling manual, reporting manual, forms, templates, EPS, WBS, etc...
  •  Developing detailed daily, weekly, and monthly project progress reports and submit to client
  • submitting extension of time claims and prolongation cost
Experience Hours (Planning & Scheduling): 
2600
Experience Hours (Cost Management): 
2550
Experience Hours (Forensic Analysis): 
2400

Sr Panning Engineer, assafco , (c) construction of road, 400 Bed Hospital

START Date: 
June, 2013
END Date: 
March, 2015
  • Prepare Project Planning Dossier including Project Control Procedure, Project Baseline Schedule, Deliverable Register, S Curve and Histogram.
  •  Developing and implementing standard project controls practices including scheduling manual, reporting manual, forms, templates, EPS, WBS, etc...
  •  Developing detailed daily, weekly, and monthly project progress reports and submit to client
  • submitting extension of time claims and prolongation cost
Experience Hours (Planning & Scheduling): 
2600
Experience Hours (Cost Management): 
2550
Experience Hours (Forensic Analysis): 
2400

Sr Panning Engineer, assafco , (c) construction of road, 400 Bed Hospital

START Date: 
June, 2013
END Date: 
March, 2015
  • Prepare Project Planning Dossier including Project Control Procedure, Project Baseline Schedule, Deliverable Register, S Curve and Histogram.
  •  Developing and implementing standard project controls practices including scheduling manual, reporting manual, forms, templates, EPS, WBS, etc...
  •  Developing detailed daily, weekly, and monthly project progress reports and submit to client
  • submitting extension of time claims and prolongation cost
Experience Hours (Planning & Scheduling): 
2600
Experience Hours (Cost Management): 
2550
Experience Hours (Forensic Analysis): 
2400

Sr Panning Engineer, assafco , (c) construction of road, 400 Bed Hospital

START Date: 
June, 2013
END Date: 
March, 2015
  • Prepare Project Planning Dossier including Project Control Procedure, Project Baseline Schedule, Deliverable Register, S Curve and Histogram.
  •  Developing and implementing standard project controls practices including scheduling manual, reporting manual, forms, templates, EPS, WBS, etc...
  •  Developing detailed daily, weekly, and monthly project progress reports and submit to client
  • submitting extension of time claims and prolongation cost
Experience Hours (Planning & Scheduling): 
2600
Experience Hours (Cost Management): 
2550
Experience Hours (Forensic Analysis): 
2400

Bian Mutang Tagal

First Name: 
Bian
Last Name: 
Mutang Tagal
  • Planning & Scheduling Software (Proficient): Primavera P6 PPM
  • Planning & Scheduling Software (Basic): Tilos
  • BIM Workflows: Revit (Basic), Synchro 4D (Learning), BEXEL Manager (Learning)
  • Certifications: PMP (Learning), Primavera P6 Basic, Resource, Advanced, Basic Drone Operation
  • Programming Ability: Excel VBA
  • Other Skills: UAV Pilot (DJI Phantom 4A/3A - Total Flight Time 47hrs, Flight Times 290, Distance 1428km)
  • Current Industry: Civil Construction (Highway and Road Construction)
  • Past Industries: Offshore Platform Topside
Professional Since: 
Jan-2014 (6.6 yrs experience)
Oldest experience: 
Jan 2014 (6.6 yrs experience)
Years Experience: 
3

Market Place

See how the TIME - LOCATION - VIEW brings clearness to your work programmes
Primavera P6 and Microsoft Project books, on-line video training courses and training material available from an internationally recognised publisher and PMI accredited REP. Teach yourself using on-line or book based learning or run your own in-house or public PMI accredited courses.
For 25+ years, APMX has been providing competency based project management training to Fortune 500 companies around the world, applying the principles of project based learning, designed to produce measurable results, generating a favorable “return on training investment”.
Syndicate content