Guild of Project Controls: Compendium | Roles | Assessment | Certifications | Membership

McDermott Caspian Contractors

Certification Inspector, McDermott Caspian Contractors, Inc., BP ACG Full Field Development (Fabrication of 4 Integrated Topside Decks)

START Date: 
April, 2002
END Date: 
June, 2002
 Quality Management System set up to comply with the Project requirements to controlStructural/Piping fabrication, including dimensional and weight control, material traceability numbers,NDT, welding, welder qualifications, ISO drawings, Site Instructions and offshore documentation MCCI Project Certification System set up for Project Certification and Final Handover PackagesPreparation

Certification Inspector, McDermott Caspian Contractors, Inc., BP ACG Full Field Development (Fabrication of 4 Integrated Topside Decks)

START Date: 
June, 2002
END Date: 
June, 2005
 Authoritative acting of documenting compliance with requirements of Quality Assurance ManagementProcedures related to Structural/Piping fabrication, including dimensional and weight control, materialtraceability numbers, NDT, welding, welder qualifications, ISO drawings, Site Instructions and offshoredocumentation Monitoring the timely input of DATA onto the special proprietary database (MCCI Project CertificationSystem) and Progress of Certification. Reports generation required in the Project Certification.

Market Place

Primavera P6 and Microsoft Project books, on-line video training courses and training material available from an internationally recognised publisher. Teach yourself using on-line or book based learning or run your own in-house or public courses.
Syndicate content