Senior Controls Engineer, AL JABER ENERGY SERVICES / Technip, Takreer Refinery

START Date: 
April, 2003
END Date: 
June, 2004

§  Establishing, maintaining and monitoring the fully detailed schedule of the project, including resource loading for activities, using “Primavera P3”.

§  Producing "what-if" scenarios of the schedule and proposing amendments and alternatives to construction methods, as and when required, to maintain project targets.

§  Updating the overall programs. Preparing in conjunction with concerned staff the detailed short-term work programs as necessary, accentuating any revision in the sequences of duration of activities arising from enforced changes being made to the overall program.

§  Checking progress of the above programs by frequent site inspection, and stress on site supervisors the need to adhere to the required sequence and durations of the scheduled activities.

§  Establishing and producing reporting system, both to the client (daily, weekly, monthly, 4-week look-ahead) and internally (productivity, construction status).

§  Preparing programs as required prior to the letting of sub-contractors to arrange continuity of work for the sub-contractor. Issues necessary programs to sub-contractors on site and check to ensure that their activities are kept in line with contract requirements.

Establishing and updating labor resource programs showing the work force required for each direct trade, and for major sub-contractors when applicable.