PLANNING ENGINEER

Planning Engineer, Nael & Bin Harmal Hydroexport, Roads and Infrastructure Works for Neima 2 Residential Area, Al Ain, UAE

START Date: 
January, 2013
END Date: 
May, 2014
  • Preparation of baseline program after carefully studying the contract documents and consultation with the Project team.
  • Preparation of weekly and monthly updated programs.
  • Preparation of daily, weekly and monthly reports.
  • Discuss weekly progress in progress meetings with the client
  • Attend design coordination meetings for any potential impacts on scope, budget and time.
  • Frequent site visits to collect progress information and discuss site issues with the project manager.
  • Daily meetings with the site execution team to ensure the project mee

Planning Engineer, Strategies and Tactics Management Consultancy, Construction of New Ruwais Bypass, Abu Dhabi, UAE

START Date: 
April, 2009
END Date: 
December, 2012

Undertook the following on a wide variety of building and Infrastructure Projects:

Planning Engineer, Petroserv Limited, Various projects with Qatar Petroleum and Ashghal

START Date: 
July, 2012
END Date: 
June, 2015

-Developed Projects Baseline Schedule/Execution Plans, Resources and cost loading, Manpower Histogram, Progress S-Curve, Cash Flow and Progress Measur

Planning Engineer, Green Modeling Contracting LLC, Neuro Spinal Hospital

START Date: 
August, 2017
END Date: 
August, 2018
  • Prepare construction program of works related to Civil /Structural/ID /MEP / Firefighting & Fire alarm/ELV discipline wise detailed man-hours , cash flow, dashboards, s-curves using Primavera P6 & MS Project and ensure that the Project Plan reflects the project scope and is fully resourced and cost loaded in reference to the BOQ and Engineering drawings issued for site construction.
  • Prepare Revised Program for the remaining works and recovery program.
  • Check and Update program of works as required for the project through close out, integrating contractor and prog
Experience Hours (Planning & Scheduling): 
2000
Experience Hours (Forensic Analysis): 
2000

Planning Engineer, Tecnicas Reunidas, Talara Refinery Modernisation

START Date: 
December, 2015
END Date: 
August, 2017
-Develop Work breakdown structures.-Develop Schedule-Collect field data to develop and update project Master Schedule.-Monitor and measure weekly construction progress and performance.-Revise the project plan and project schedule (re‐planning and re‐baselining) as required.-Prepare and provide project progress reports.-Control progress and performance of contractors.-Develop shutdown schedules.-Prepare procedures and guidelines for project planning and scheduling management and control.-Assi
Experience Hours (Planning & Scheduling): 
2200
Experience Hours (Cost Management): 
0
Experience Hours (Forensic Analysis): 
1000

Planning Engineer, Graña y Montero, Las Bambas Copper Concentrator

START Date: 
January, 2013
END Date: 
October, 2015
-Develop Schedule-Develop Work breakdown structures.-Collect field data to develop and update project Master Schedule.-Monitor and measure weekly construction progress and performance.-Revise the project plan and project schedule (re‐planning and re‐baselining) as required.-Control progress and performance of contractors.-Reporting.-Lean Construction.-Forensic Scheduling.-Earned Value.-Budget Control.
Experience Hours (Planning & Scheduling): 
3200
Experience Hours (Cost Management): 
1000
Experience Hours (Forensic Analysis): 
1000

Planning Engineer, Siemans, GREAT MAN MADE RIVER PROJECT

START Date: 
April, 2000
END Date: 
November, 2001

Development of schedules for design and installation of the SCADA remote operating systems for Great Man Made River Phase 2 (the pumping of fresh water from an underground lake through 1,000km of 5m diameter Water Pipe and Pumping Stations between south Libya and Tripoli).

Experience Hours (Planning & Scheduling): 
2750

Planning Engineer, Lothian Regional Council, General Maintenance of Lothian Region Water & Drainage

START Date: 
June, 1992
END Date: 
February, 1995

Provision of the day to day planning for maintenance and emergency repair of the water and drainage services.

Experience Hours (Planning & Scheduling): 
3000

Planning Engineer, BNFL (Sellafield Sites), Enhanced Actinide Removal Plant

START Date: 
February, 1992
END Date: 
March, 1993

Development of schedules, progress updates and reports for the Enhanced Actinide Removal Plant Commissioning. 

Experience Hours (Planning & Scheduling): 
2000

PLANNING ENGINEER, kazstroy services india ltd., Guru Gobind Singh Refinery Project

START Date: 
July, 2008
END Date: 
June, 2010

2008 -2010                    HMEL “Guru Gobind Singh Refinery Project”

  • CDU/VDU, DHDT & NHT/CCR Heaters Works

EPC Project with In- House Engineering and successful completion of heaters with commissioning assistance to the client.

 

Main activities:

 

Experience Hours (Planning & Scheduling): 
3650
Experience Hours (Cost Management): 
600
Experience Hours (Forensic Analysis): 
200