EOT Claims

Senior Controls Engineer, AL JABER ENERGY SERVICES / Technip, Takreer Refinery

START Date: 
April, 2003
END Date: 
June, 2004

§  Establishing, maintaining and monitoring the fully detailed schedule of the project, including resource loading for activities, using “Primavera P3”.

§  Producing "what-if" scenarios of the schedule and proposing amendments and alternatives to construction methods, as and when required, to maintain project targets.

Projects Planning Manger, Arabtec Construction LLC, Anantara Palm Jumeirah Hotel and Tiara Residences Nakheel Properties

START Date: 
August, 2006
END Date: 
November, 2010

§  Head up and lead the team of skilled planners working on the projects valued at 2.5+ Billion AED including:

o   Project comprising of 2 Hotel Towers, 7 Residential Towers, Parking Building, Club House and Swimming Pools at Palm Jumeirah Dubai.

o   Project comprising of 2 high rise towers, podium and 2 parking buildings

§  Full Communication with Clients and Senior Management

planner, MDC, OHL, airport

START Date: 
June, 2013

Date: May 2012 to January 2013

Position: Planner/Scheduler

Project: 60 storey condominium

Duties and responsibilities:

Provide a coherent and meaningful construction schedule in P3 format.

planner, MDC, OHL, airport

START Date: 
June, 2013

Date: May 2012 to January 2013

Position: Planner/Scheduler

Project: 60 storey condominium

Duties and responsibilities:

Provide a coherent and meaningful construction schedule in P3 format.

planner, MDC, OHL, airport

START Date: 
June, 2013

Date: May 2012 to January 2013

Position: Planner/Scheduler

Project: 60 storey condominium

Duties and responsibilities:

Provide a coherent and meaningful construction schedule in P3 format.

Planner/Scheduler, Yuksel Construction Co., Widening of Dubai Bypass Road Phases I and II

START Date: 
August, 2007
END Date: 
May, 2008

Prepared and updated the construction schedule using Primavera. Prepared manpower histograms, S curves and commodity curves. Prepared site progress reports. Prepared PCNs, claims and correspondence according to FIDIC Red Book. Prepared quantity surveying for structural works. Prepared contracts for subcontract and supply agreements. Prepared comparison statements for subcontractors’ quotations. Prepared work methodologies and risk assessments for related civil works

Post Graduate Student, spcl, delay analysis

START Date: 
June, 2013

 i am a post graduate student in construction techonology, i m doing a thesis on delay analysis  based on time impact analysis.

Post Graduate Student, spcl, delay analysis

START Date: 
June, 2013

 i am a post graduate student in construction techonology, i m doing a thesis on delay analysis  based on time impact analysis.

Contracts and Reporting Engineer, Lahmeyer International, Hydro Electric Dam

START Date: 
November, 2012

Reporting of work progress

Review claims

Assist Chief Cont. Engineer 

Review program of works (POW)

Monitior and Compare actual site progress with original program

Contracts and Reporting Engineer, Lahmeyer International, Hydro Electric Dam

START Date: 
November, 2012

Reporting of work progress

Review claims

Assist Chief Cont. Engineer 

Review program of works (POW)

Monitior and Compare actual site progress with original program

Market Place

For 25+ years, APMX has been providing competency based project management training to Fortune 500 companies around the world, applying the principles of project based learning, designed to produce measurable results, generating a favorable “return on training investment”.
See how the TIME - LOCATION - VIEW brings clearness to your work programmes
Primavera P6 and Microsoft Project books, on-line video training courses and training material available from an internationally recognised publisher and PMI accredited REP. Teach yourself using on-line or book based learning or run your own in-house or public PMI accredited courses.
Syndicate content