How to create a Lookahead Filter in Microsoft Project

How would you like to create a rolling date lookahead in Microsoft Project instead of using the default Date Range filter? Users of Primavera P6 are used to defining the criteria for lookahead filters using Data Date or Current Date and we can also do same in Microsoft Project using Status Date or Current Date rather than pick hard dates all the time using the Date Range filter.