Guild of Project Controls: Compendium | Roles | Assessment | Certifications | Membership

resourcing

Assistant Planner or Planning Engineer, Costain, Thameslink - London Bridge Station Redevelopment

START Date: 
September, 2013
2013 – 2015 Current works – Costain - London Bridge Station Revelopment (as part of the Thames link programme worth £6.5 Billion): I currently work for Costain at London Bridge Station Redevelopment, since working here I have experienced planning for civil works undertaken by Costain (otherwise known as self-delivery works) and Early works such as demolition, piling and drainage (which have been part self-delivery and part subcontracted). I do both short term and long term planning.
Experience Hours (Planning & Scheduling): 
2000
Experience Hours (Cost Management): 
500
Experience Hours (Forensic Analysis): 
500

Assistant Planner or Planning Engineer, Costain, Thameslink - London Bridge Station Redevelopment

START Date: 
September, 2013
2013 – 2015 Current works – Costain - London Bridge Station Revelopment (as part of the Thames link programme worth £6.5 Billion): I currently work for Costain at London Bridge Station Redevelopment, since working here I have experienced planning for civil works undertaken by Costain (otherwise known as self-delivery works) and Early works such as demolition, piling and drainage (which have been part self-delivery and part subcontracted). I do both short term and long term planning.
Experience Hours (Planning & Scheduling): 
2000
Experience Hours (Cost Management): 
500
Experience Hours (Forensic Analysis): 
500

Global Recruiters, GLC Group, Permanent and Contract

START Date: 
June, 2013

The GLC Group is a specialist technical recruitment consultancy, focusing on mid to senior level applicants for contract and permanent roles.

Our reputation is built on the delivery of a service that goes beyond traditional recruitment practices, and is what attracts clients and candidates of the highest caliber to our door.

We aim to offer solutions to companies small and large, specialist to generalist, dynamic or compact. Our efforts are reflected through our Leaders, Determination and the magic of Teamwork.

Resource Manager, Exclaim IT, IT Recruitment

START Date: 
March, 2011

Resource Manager, Exclaim IT Brisbane

Identify high quality IT & GIS candidates for contract & permanent opportunities.

Resource Manager, Exclaim IT, IT Recruitment

START Date: 
March, 2011

Resource Manager, Exclaim IT Brisbane

Identify high quality IT & GIS candidates for contract & permanent opportunities.

Resource Manager, Exclaim IT, IT Recruitment

START Date: 
March, 2011

Resource Manager, Exclaim IT Brisbane

Identify high quality IT & GIS candidates for contract & permanent opportunities.

PLANNING MANAGER, China State Construction Engineering Corporation (CSCEC), MTR & KCRC Railway Projects, Site Development, Disneyland Project

START Date: 
December, 2001
END Date: 
April, 2007

1. JORDAN VALLEY SITE DEVELOPMENT Project in Hong Kong. It compasses a 1 Million cu.m. Rock Blasting/Excavation and built the longest Rock Conveyor, new roads and subway tunnels.

2. KCRC SOUTERN LINK RAILWAY TUNNEL (KDB300 & 200). More than 2 km floating railway tunnel construction using open-cut excavation, massive diaphragm, bored piles, secant walls, temporary sheet pile cofferdams, ground freezing, sophisticated ground investigation and instrumentations. In-charge of the tendering package and the project construction baseline.

Senior Consultant, Oracle, Multiple

START Date: 
January, 2009
END Date: 
February, 2010

 

Oracle Corporation UKSenior ConsultantResponsible for designing and implementing planning and portfolio managementsystems using the Primavera suite of tools, including initial contact through totraining of end users where required.

Chief Operating Officer and Chief Project Officer, Glynx Pty Ltd, Glynx

START Date: 
December, 2007
END Date: 
October, 2010

Software development, testing and QA. Project and Risk Management. Contract management and procurement. Shareholder and stakeholder communications. Day to day operations management.

Assistant Project Manager / Project Planner, John Doyle Construction Ltd, Various

START Date: 
July, 1999
END Date: 
January, 2006

Project Planner / Assistant Project Manager

1 Coleman Street, Structural concrete to office development on Coleman Street by Moorgate Station, London

Client: Stanhope and Bovis Lend Lease

The scheme includes major ground works, substructure concrete, and steel frame superstructure with in-situ concrete slabs.

 

2004 – 2005 Assistant Pr

Market Place

Primavera P6 and Microsoft Project books, on-line video training courses and training material available from an internationally recognised publisher. Teach yourself using on-line or book based learning or run your own in-house or public courses.
Syndicate content