2013 – 2015 Current works – Costain - London Bridge Station Revelopment (as part of the Thames link programme worth £6.5 Billion):
I currently work for Costain at London Bridge Station Redevelopment, since working here I have experienced planning for civil works undertaken by Costain (otherwise known as self-delivery works) and Early works such as demolition, piling and drainage (which have been part self-delivery and part subcontracted).
I do both short term and long term planning.
An Achievement focused individual able to work under pressure. Professionally presented with a flexible yet methodical approach and a positive, proactive attitude to create a robust outcome with confidence. Adaptable to different industry requirements with a flexible schedule.
- Successfully completed Primavera P6 professional fundamentals Training at Oracle University.
Professional Since:
Sep-2012(12.7 yrs experience)
Oldest experience:
Oct 2012(12.6 yrs experience, WARNING: 0.1 years variance with Professional Since)
2013 – 2015 Current works – Costain - London Bridge Station Revelopment (as part of the Thames link programme worth £6.5 Billion):
I currently work for Costain at London Bridge Station Redevelopment, since working here I have experienced planning for civil works undertaken by Costain (otherwise known as self-delivery works) and Early works such as demolition, piling and drainage (which have been part self-delivery and part subcontracted).
I do both short term and long term planning.
London Underground Station Stabilisation Programme - Lead Planner Stations
The remit of Stations Stabilisation Programme is to modernise 70 stations to make them safer and improve the customer experience. The actual works involve IT & Communications systems upgrades, improving energy efficiency and refurbishing the buildings while maintaining heritage features.