Hampshire (EU.UK.HAM)

Shannon Hedges

First Name: 
Shannon
Last Name: 
Hedges
Oldest experience: 
Apr 2018 (1.4 yrs experience, WARNING: 48.2 years variance with Professional Since)
Years Experience: 
0

Assitant Planner, Galliford Try (Infrastructure Division), Southern Water AMP 6

START Date: 
April, 2018
• Use of Primavera P6 systems • Support the planning function, which involves creating and managing project schedules at a detailed level. • Work closely with senior management, project teams, design teams and sub-contractors to maintain accurate and up to date data for different stages of projects. • Track and evaluate progress of live sites and the pre-construction phases • Produce fully logic linked programmes - pre-construction, tender, project (short term and full programmes). • Attend meetings to gather/request information relating to programme implications. • Ensure accurate/time

Assitant Planner, Galliford Try (Infrastructure Division), Southern Water AMP 6

START Date: 
April, 2018
  • Use of Primavera P6 systems
  • Produce fully logic linked programmes
  • Support the planning function
  • Creating and managing programmes at a detailed level

Construction Interface planner, Fluor UK, TCO – FGP – WPMP (Wellhead Pressure Management Project)

START Date: 
November, 2016
END Date: 
April, 2017
This role is to coordinate and maintain the engineering Construction Interface tracker which is the main multi discipline focal point document for the engineering team in Farnborough, Almaty and Houston with the construction site in Tengiz, Kazakhstan. To maintain good communication between all WBS areas, existing area meetings were enhansed with additional meetings so that the tracker was up to date and all changes visable for discussion in the weekly review meeting by management and lead engineers.  Any slippages within the multiple P6 schedules had to be challenged by liaising

Gyles Shergold

First Name: 
Gyles
Last Name: 
Shergold

Position: Primavera P6 Scheduler / Planner Supervisor 2013 - Present

Position: Senior SAP Planner Supervisor 2010 - 2013

Position: T/A Superintendent (Assignment) 2009 - 2010

Position: Multi-Trade Maintenance Supervisor 2007 - 2009

Position: Senior Machinery Planner 2004 - 2007

Position: Assignment: SAP Implementation Team 2001 - 2002

Position: Machinery Reliability Technician 1997 - 2001

Position: Machinery: Technician / Senior Technician 1992 - 1997

Position: Trainee Machinery Technician 1989 - 1992

Professional Since: 
Jun-1991 (28.2 yrs experience)
Oldest experience: 
Apr 1989 (30.4 yrs experience, WARNING: 2.2 years variance with Professional Since)
Years Experience: 
29

Senior SAP Planner, ExxonMobil, Fawley Refinery Maintenance

START Date: 
March, 2001
END Date: 
December, 2013
Senior SAP Planning / Senior Machinery Planner / Senior Machinery Planner Set up a chemical planning team to deal with the massive backlog of notifications requiring planning. Developed and implemented a tracker/evaluation system for the monitoring progress. Set up variants to identify critical SAP notification to give clarity of the precise number in the system. Worked hard with the business teams to review the back log, tag priorities and reduce the numbers. This was highlighted at the end of year review as a site success. Trained in using GEMS/STRIPS a SAP base system.
Experience Hours (Planning & Scheduling): 
20000
Experience Hours (Cost Management): 
3000
Experience Hours (Forensic Analysis): 
3400

Senior Primavera Support Specialist, Exxon Mobil, Fawley Refinery Turnarounds and Events

START Date: 
January, 2013
Senior Primavera P6 Scheduler / Planner Supervisor Main Responsibilities: Help set up a new Programmes Event Team to undertake small yearly outage which the turnaround team used to undertake. This was initial a three person group made up of a Superintendent, Primavera planner/scheduler and a lead field engineer. Due to my SAP back ground I was asked to learn Primavera and set up this role as I saw fit.
Experience Hours (Planning & Scheduling): 
10000
Experience Hours (Cost Management): 
1000
Experience Hours (Forensic Analysis): 
2000

Angela Obande

First Name: 
Angela
Last Name: 
Obande

I am a versatile and successful Planning/Project Controls Engineer with over seven years’ experience in pro

Professional Since: 
Jan-2007 (12.6 yrs experience)
Oldest experience: 
Jan 2017 (2.6 yrs experience, WARNING: 10.0 years variance with Professional Since)
Years Experience: 
10

Planner, Hitachi Rail Europe, TMS

START Date: 
January, 2017

I am a versatile and successful Planning/Project Controls Engineer with over seven years’ experience in pro

Market Place

For 25+ years, APMX has been providing competency based project management training to Fortune 500 companies around the world, applying the principles of project based learning, designed to produce measurable results, generating a favorable “return on training investment”.
Primavera P6 and Microsoft Project books, on-line video training courses and training material available from an internationally recognised publisher and PMI accredited REP. Teach yourself using on-line or book based learning or run your own in-house or public PMI accredited courses.
See how the TIME - LOCATION - VIEW brings clearness to your work programmes
Syndicate content