Sr. Project Manager - Planning & Controls, Majid Al-Futtaim Properties, Mall of the Emirates Exp., Mall of Egypt, Mall of Oman, Al Zahia Mixed Use, Me'aisem CC

START Date: 
May, 2013

Sr. Project Manager - Planning & Controls, Dubai - UAE @ Majid Al Futtaim Properties

Experience Hours (Planning & Scheduling): 
4000
Experience Hours (Cost Management): 
1500
Experience Hours (Forensic Analysis): 
1000

Project Planning Consultant, South Stream Transport B.V., South Stream

START Date: 
November, 2012
END Date: 
December, 2012

Provide support to the Commercial Team for getting coated linepipe supply contracts and offshore pipeline installation contract for 4 pipelines of about 900 km from Russia to Bulgaria through the Black Sea in place.

Programme Planner & Financial Control Lead, Northrop Grumman Sperry Marine, Defence Portfolio

START Date: 
October, 2016

Programme Planner & Financial Control Lead (PPFCL)

 

Responsible for:

  • Reviewing and improving the EVM Performance of the Defence Unit of Sperry Marine
  • Developing a mature Project Controls organisation
  • Grwoing the utilisation of the Schedule within the SM portfolio of projects
  • SME for EVM and Scheduling.
  • Ensuring quality is at the centre of the PPCF functions outputs

Project Controls Manager, Bombardier Transportation (Malaysia), Rawang-Ipoh Mainline Electrification, Malaysia

START Date: 
September, 2000
END Date: 
August, 2003
Budgetary responsibility for Project Controls Department with local staff of four. Responsible for development and execution of integrated project schedule in Primavera P3 at Consortium level for all E&M system works (Overhead Catenary, Power Supply, Signalling, Telecommunications, Automated Fare Collection, CCTV and Station SCADA) both offshore (production, factory testing, delivery), and onshore (installation and commissioning).  Other responsibilities include:Preparation of payment schedule derived from programme

Regional Scheduler and Risk Coordinator, Bombardier Transportation, multiple projects

START Date: 
September, 2003
END Date: 
December, 2007
Scheduling and risk management for a range of software development and implementation projects. Coordination of up to 14 subcontractors and development partners, often in different countries, with integrated schedules in either Primavera P3e, P3 or MS Project. Preparation and maintenance of reports both internal and for Customer use including Key Performance Indicators such as milestone tracking and earned value analysis. Work Package-based planning with cost control of work packages using SAP and Excel.

Head of Primavera Competence Center, Bombardier Transportation, Multiple projects

START Date: 
January, 2008
END Date: 
February, 2013
Managing a Primavera P6 implementation with 2300 timesheet users and around 400 Project managers, using the tool for scheduling, resource planning and time-reporting on a portfolio of approximately 700 active projects.

Project Controls Specialist (EPC), CDM Smith, (various projects) all in US

START Date: 
October, 2008

Work Experience

CDM Smith

PROJECT / PROGRAM CONTROLS SPECIALIST        Oct 2008 - Present

Planning/Scheduling

·        Nine years of experience in planning/scheduling/cost engineering and reporting

·        Primavera P6 and Microsoft Project Professional 2010/13 Master Level

Experience Hours (Planning & Scheduling): 
16000
Experience Hours (Cost Management): 
8000
Experience Hours (Forensic Analysis): 
4000

Project Controls Manager, CCC (Consolidated Contractors Company), King Abdulaziz International Airport - Jeddah, Saudi Arabia

START Date: 
January, 2015

As a Project Controls Manager

Experience Hours (Planning & Scheduling): 
5000
Experience Hours (Cost Management): 
2000

Plant Operator-Utilities/Pumping & Shipping, CALTEX (Philippines) Refinery, Philippines , Various in-house projects, operation's productivity program, production planning and scheduling

START Date: 
July, 1979
END Date: 
June, 1981
My functions includes the following: Obtain accurate process reading, determine stock transfers and shipments, perform product inventory, blend products, operate the TEL plant, periodic sampling and operation of plant equipment, safety inspection, switching, transferring, feeding in of petroleum products and derivatives to different process unit, equipment maintenance, shutdown, start ups, o
Experience Hours (Planning & Scheduling): 
2550
Experience Hours (Cost Management): 
800
Experience Hours (Forensic Analysis): 
600

Staff Engineer , Coconut Chemicals Inc. (Cocochem)-Philippines , Ballestra Sulfonation Pilot Plant, Commissioning and Start Up program, CMMS development and implementation

START Date: 
July, 1985
END Date: 
October, 1990
Maintenance planning and scheduling during my first year and as a Vibration Technician/Analyst in my second year under the T & I Support Group, Abu Ali Producing and Maintenance Division of ARAMCO, material estimating, support the development of the field's preventive maintenance program, help document various engineering work packages, tag construction work packages; request, receive, c
Experience Hours (Planning & Scheduling): 
4350
Experience Hours (Cost Management): 
1350
Experience Hours (Forensic Analysis): 
1000