BSC in Civil Engineering 2008, Ain Shams University, 4 years Experience in Planning of Construction Projects in Egypt & Saudi Arabia.

Dealing with contract study, preparation of master, detailed, revised & recovery schedules, preparation of claims & variation orders.

Having the experience of the Infrastructure project for "Al Khama'el City - Stage II" including all the underground networks, electrical facilities, roads & service checkpoints,

Chalenging "The International Regional Ring Road (Badr-Al Fayoum) - 2nd Sector" including highway road works,

Professional Since: 
Aug-2008 (11.4 yrs experience)
Oldest experience: 
Aug 2008 (11.4 yrs experience)
Years Experience: 
11

Hussamuldeen Albaghajati

First Name: 
Hussamuldeen
Last Name: 
Albaghajati

I'm Syrian civil engineer have graduated at 1991,  from Civil Engineering Faculty of Damascus Univercity in Syria.
I worked in syria for 8 years in many fields, (housing construction, water pipe lines, water reservoirs, etc.).
I moved to Saudi Arabia in 1998 and worked with Saudi Binladin Group upto date.
I shared SBG Group teams in many big projects, highways, infrastructure, bridges, and now in one of  mega projects in "Haramin Division" in MAKKAH.

Professional Since: 
Jan-1991 (28.9 yrs experience)
Oldest experience: 
Oct 1998 (21.2 yrs experience, WARNING: 7.7 years variance with Professional Since)
Years Experience: 
49

Area Project Manager, Saudi Binladin Group-Haramin Division, Electrical tunnels and culverts in Makkah central area

START Date: 
October, 1998

Working on guiding, reviewing, controlling majer tasks of all involved sections in project.
Sharing the Project Director and project teams in discussing, solving issues, and obstacles that may affect on project schedule, and advise the higher managment to made the appropriate decisions.

Experience Hours (Planning & Scheduling): 
500
Experience Hours (Cost Management): 
200
Experience Hours (Forensic Analysis): 
400

Mohamed Alia

First Name: 
Mohamed
Last Name: 
Alia
  • Certified as (PMP)®         : Project Management Professional

                  (PMI-SP)®     : PMI Scheduling Professional

 

              & (PMI-RMP)®   : PMI Risk Management Professional

 

Professional Since: 
Dec-1994 (25.0 yrs experience)
Oldest experience: 
Dec 1994 (25.0 yrs experience)
Years Experience: 
23

MUHAMMED MANEEF

First Name: 
MUHAMMED
Last Name: 
MANEEF

*       Project Management

*       Planning and Control

Professional Since: 
Apr-2013 (6.7 yrs experience)
Years Experience: 
0

Fire Systems Cost Estimator and FAS Design, Saudi Sicli-Jeddah Saudi Arabia., Yanbu Desalination Plant, Medine Hotel, Petrola Rabigh

START Date: 
September, 1990
END Date: 
November, 1992

Fire Systems Electrical Engineer, 

  • Design of Fire Alarm and Halon 1301 System as per NFPA Codes.
  • Tender and bid preparations, estimates, costing for supply, installation, maintenance of fire suppression (Halon 1301) and fire alarm system.
  • Survey and assessment of actual site condition for pipe routes, supports and orientation of gas cylinders.
  • Calculate volumes of rooms, floor voids and ceiling voids of the room to be protected.
Experience Hours (Cost Management): 
5500

Mohammad Zishan

First Name: 
Mohammad
Last Name: 
Zishan

Primavera P6

MS Office

Photoshop

Pagemaker

Auto Cad

Professional Since: 
Jul-2010 (9.4 yrs experience)
Oldest experience: 
May 2019 (0.6 yrs experience, WARNING: 8.8 years variance with Professional Since)
Years Experience: 
49

Project Planner Primavera P6, Saudi Aramco, & Oil & Gas Projects

START Date: 
May, 2019
  1. Plan and schedule the project by developing a project master schedule in line with the proposal requirements through the application of the primavera P6 software.
  2. Understand and able to utilize planning tools such as MS excel, Access, Good Knowledge about Primavera P6 Version 8.3, SAP and MIS.
  3. Identify the Project Deliverables, Milestones, and required tasks and targets to determine the staffing requirements, and allotment of available resources to various phases of the project through the project measurement system.  
  4. Implement the work schedule and m
Experience Hours (Planning & Scheduling): 
17000
Experience Hours (Cost Management): 
0
Experience Hours (Forensic Analysis): 
0

Planning Engineer, ABB SAE Sadelmi, 380/132 kV Substation 9009

START Date: 
October, 1995
END Date: 
February, 1996
Responsible for planning and reporting on the 380/132 kV Substation 9009 project, consisting in 30 bays of 380 kV Gas Insulated Switchgear and 14 bays of 132 kV Gas Insulated Switchgear.

Senior Project Controls /Planning Engineer, SABIC PMT, YANSAB- SABIC

START Date: 
May, 2008
END Date: 
July, 2012

Responsibilities included designing logical schedules for new projects, creating monitoring tools and analysis. Additionally, integrated pre-commissioning and commissioning of eight petrochemical facilities.

  • Monitored coordination of commissioning activities between facilities.
  • Ensured start-up activities adhered to flawless start-up methodologies
  • Ensured compliance with local standards and regulations
  • Delivered timely progress, quality assurance and budget reports
Experience Hours (Planning & Scheduling): 
8000
Experience Hours (Cost Management): 
4000

Market Place

Primavera P6 and Microsoft Project books, on-line video training courses and training material available from an internationally recognised publisher and PMI accredited REP. Teach yourself using on-line or book based learning or run your own in-house or public PMI accredited courses.
See how the TIME - LOCATION - VIEW brings clearness to your work programmes
For 25+ years, APMX has been providing competency based project management training to Fortune 500 companies around the world, applying the principles of project based learning, designed to produce measurable results, generating a favorable “return on training investment”.
Syndicate content