# Senior planning engineer, Global Marine, Vattenfall Dan Tysk 2

START Date: 
February, 2021
END Date: 
January, 2022

Vattenfall Dan Tysk Offshore Windfarm – Integrated P6 planning, progress measurement and schedule analysis for a twenty HV/FO inter array cable replacement project comprising of survey operations, cable recovery, cable lay, cable jointing, termination & testing, rockdumping, CPS installations, cable trenching & burial operations and CTV operations. Also, planning services for SSEN Skye to Harris 33kV interconnector cable replacement project and SSEN ED1 cable replacements for Mull-Coll, Orkney-Hoy and Carradale-Arran Scottish islands interconnectors.

Experience Hours (Planning & Scheduling): 
2000
Experience Hours (Forensic Analysis): 
400

Programs Analyst, Scheduling Manager, Airdyne Aerospace, All

START Date: 
April, 2019

Contract to Hire(d):

Programs Analysis, P6 Development, Enterprise Scheduling for Defense R&D/Manufacturing

Break down the work, break into and sync with other databases, create and maintain schedules and schedule reporting.

Create Intranet resources for Project Controls. Scheduling WIKI, Project Controls Library, Project Websites, Tools, Training, News

Implement and Integrate effective schedule practices.

Usher in giving an effective heartbeat of operations in order to foster sustainable growth.

Civil construction coordination planner, Mitsubishi Heavy Industry under PCS, Doha Metro Project

START Date: 
September, 2017

• MMHKT is the main Contractor for the construction of Doha Metro Rail Project • Assigned in the development of stations and stabling yard integration programme – Civil construction, tracks & 3rd rail, equipment installation, commissioning and hand-over. • Apply mixed approaches to project development thereby allowing for a more organized monitoring and control. • Review contract documents for each sub-contractors’ package, evaluate risk on the activities, and advise the Engineering/ Project Manager of any deficiency and mitigation approaches.

Experience Hours (Planning & Scheduling): 
2350

Project control specialist, Asia Project-Company, Project Control Specialist at

START Date: 
January, 2010
END Date: 
November, 2011

MS Project files to P6 files

Manpower Resource analysis

Develop the Summary Schedule for Owner Modify the Master Schedule and Work Plan Develop the CBS/COA(Cost of Account)

Procurement Schedule(Import and Local) match to Construction Schedule Develop the Construction Baseline Schedule

Engineering Schedule Review

Director of Planning and Scheduling, Riverside Group -Six Flags China, Six Flags-China Haiyan-Riverside

START Date: 
November, 2016
END Date: 
September, 2017

Six Flags China-Riverside

      1 Overall schedule for six flag and riverside (Show, Ride, Facade, Area Development, Facility(first phase and second phase infrastructure ,vacuum pre-loading treatment, piling work, foundation, structure, MEP, decoration and facade)

Claims Planner, Project Controls SME, Project Planner, Resource Speaker, ExxonMobil, keiwit energy, Saudi Aramco, Taisei Corporation, TOTAL, Worley Parsons, (various projects)

START Date: 
April, 1997
- Resource speaker and Trainer /Facilitator on various PMI Chapters, AACE Chapters, and other non-profit Engineering Organization in North America, Asia,  Australia and the Middle East. - Multiple Industry experience e.g. Oil and Gas, Railway systems, US DoD Projects, Heavy Industrial and Infrastructure mega projects with large corporations such as Saudi Aramco, ExxonMobil, Total, Siemens, Kiewit, etc.- Experience in various forms of contract i.e.
Experience Hours (Planning & Scheduling): 
22850
Experience Hours (Cost Management): 
6900
Experience Hours (Forensic Analysis): 
12900

Project Planner, Scottish & Southern Energy, Various UK and Ireland

START Date: 
September, 2013
Full lifecycle project planning for a variety of projects. Mainly in the renewables sector within the UK and Ireland - windfarms (onshore and offshore) and hydro pumped storage. Some thermal (gas) and telecoms projects also. Mostly using P6 but also MS Project depending on the job requirements. Creation of programmes from scratch following company standards and coding, management reporting and providing support to PM and commercial function on EOT's etc through NEC3.
Experience Hours (Planning & Scheduling): 
6000
Experience Hours (Cost Management): 
500
Experience Hours (Forensic Analysis): 
1500

Senior Director of Global Marketing, Oracle, Making the world a better place

START Date: 
January, 2016

Helping organizations improve strategy execution, operations & financial performance with Oracle Construction and Engineering Cloud solutions

Project Controls Specialist, Voltrak, BMW Plant

START Date: 
November, 2016

From november 2016 to this date I´ve been working as a project controls specialist for Voltrak, in the construction of a BMW Plant in Mexico.

Experience Hours (Planning & Scheduling): 
4800
Experience Hours (Cost Management): 
1700

Maintenance and Facility Manager, Horton Automatics, Manufacture Doors

START Date: 
December, 2016

Maintenance & Facility Manager @ Horton Automatics, Corpus Christi, TX

Maintain CNC Routers, Saws, Waterjet and many other Manufacturing assets.

Maintain 115,000 Facility, Shop & Office Space for 140 employees.

Administrator for eMaint, CMMS, for all maintenance.

MicroSoft Projects 2013 for larger projects.

We build automatic and revolving doors for around the world, hospitals, schools, airports, subway systems, and any architectural designed customization application.

Experience Hours (Planning & Scheduling): 
500
Experience Hours (Cost Management): 
500