PLANNING ENGINEER, IMCO Engineering and Construction Co. WLL., Maintenance and Construction Project

START Date: 
August, 2008

A well presented and experienced PlanninG Engineer with over more than 9.8 years of extensive experience in the filed of Maintenance of Refinery Equipments and Execution and Shutdown Planning, Construction Project Oil and Gas Field, Oil and Gas Facilities Maintenance.

  • Planning and Scheduling
  • Maintenance of Refinery Equipments
  • Routine, Preventive ,Corrective and Shutdown Maintenance
  • Trunaround and Unscheduled Shutdown
  • Contstruction Project in Oil and Gas Field
  • Project Execuation
  • Material Management
Experience Hours (Planning & Scheduling): 
19650

Planning Engineer, EFECO Saudi, Princess Nora Bint Abdulrahman University – Riyadh - KSA. (Largest Women’s University)

START Date: 
September, 2009
END Date: 
June, 2011
Was part of one of the prestigious project in Saudi Arabia “Princess Noura University” with a project value of 13 BillionUSD.• Preparation of Planning Package and Submit it to client for Approval in Primavera 6.• S Curve Preparation.• Monitoring, Controlling of the Project.• Assisting the Project Manager in controlling the project in effective way.• Cash Flow and Budget Preparation & Monitoring.• Resource (Manpower and Equipment) Schedule preparation.• Daily monitoring of site activity and reportin
Experience Hours (Planning & Scheduling): 
5150
Experience Hours (Cost Management): 
1800

Planning Engineer, Power Point L.L.C, Jumeriah Park Package 2 and 2a – 4 Bedroom- 525 Villa, Platinum Tower – 4B + G + 44 Floor Office Building

START Date: 
August, 2008
END Date: 
August, 2009
• Preparing detailed planning program using Primavera software ( P3 )• Monitoring the progress with respect to the baseline program.• Daily and Weekly Report Issue.• Preparation of manpower requirement for the project.• Project Productivity Monitoring, Reporting and Controlling.• Preparation of Monthly and Weekly report for Client and Internal Review.• Material delivery schedule preparation according to the requirement at site.• PRepare Monthly Incoive and Coordinate with Main Contractor till Approval.
Experience Hours (Planning & Scheduling): 
3250
Experience Hours (Cost Management): 
1000

Planning Engineer, Daewoo E & C, Construction of Ship Repair Yard and Dry Dock Complex

START Date: 
August, 2010
END Date: 
December, 2011

Updating project schedule weekly and monthly basis with baselining.

Evaluate monthly interim valuation versus actual site progress.

Prepare recovery plans incase of schedule slippage.

Prepare monthly detailed updated program and lookahead schedules.

Prepare detailed reports regarding various construction operation held on site.  

Planning Engineer, Daewoo E & C, Construction of Ship Repair Yard and Dry Dock Complex

START Date: 
August, 2010
END Date: 
December, 2011

Updating project schedule weekly and monthly basis with baselining.

Evaluate monthly interim valuation versus actual site progress.

Prepare recovery plans incase of schedule slippage.

Prepare monthly detailed updated program and lookahead schedules.

Prepare detailed reports regarding various construction operation held on site.  

Planning & Project Control Manager, Elecnor, La Raisa temporarl and Termocentro projects

START Date: 
October, 2009
END Date: 
May, 2011

Key Leader responsible of developing and issuing the Project Control procedures, the Risk and Opportunity Management Plan, the Contract Master Schedule and the internal Control Budget for building four electrical substations along with their electrical interconnection by means of 230 Kv power lines (Termocentro- turnkey project). Main duties included:

Experience Hours (Planning & Scheduling): 
350
Experience Hours (Cost Management): 
350
Experience Hours (Forensic Analysis): 
150

Project Controls Analyst, Kiewit Power Constructors, Pio Pico Power Plant

START Date: 
April, 2013
END Date: 
May, 2014

Kiewit Power Engineers, Transmission & Delivery

Experience Hours (Planning & Scheduling): 
800
Experience Hours (Cost Management): 
1000
Experience Hours (Forensic Analysis): 
1000

Project Controls Manager, SNC Lavalin Minerconsult, Apolo, Paracatu, S11D

START Date: 
July, 2008
END Date: 
July, 2011

SNC Lavalin Minerconsult (http://www.minerconsult.com)

Experience Hours (Planning & Scheduling): 
2000
Experience Hours (Cost Management): 
1000

Assistant Construction Manager, Larsen & Toubro Construction Co. - Hydrocarbon Div., EPC Gathering Station and Cross Country Pipelines

START Date: 
July, 2008

Presently employed with M/s L&T Hydrocarbon Engineering Limited, a subsidiary of M/s Larsen &Toubro Ltd.( previously known as Hydrocarbon & Pipeline division of L&T). Joined the Organization as a GET (Graduate Engineer Trainee) in 2008 and since then had gathered experience in handling various facets of the following EPC projects,

Experience Hours (Planning & Scheduling): 
11300
Experience Hours (Cost Management): 
7300

Planning & Project Control Engineer, Punj Lloyd Limited, 34" Gas Transmission Pipeline Projects

START Date: 
November, 2006
END Date: 
February, 2008

Ø  Planning and scheduling, Developing and updating Project Control and Progress Measurement Methodology, Establishing and maintaining the projects plans and ensure that all plans are consistent for both parallel running projects. Review Vendor schedules and identifying the critical path.

Ø  Coordinating with Engineering subcontractors and vendors from across the Europe, Asia and other international locations.

Experience Hours (Planning & Scheduling): 
2500
Experience Hours (Cost Management): 
2500