Senior Planning Engineer

Senior Planning Engineer, OMV, Nawara Project

START Date: 
January, 1989

Main Skills

Settlement of Planning Procedures, Guidelines and early stage activities. Development of high level Schedules. Evaluation, guidance and coordination of Contractor’s schedule and control system from Pre-FEED phase to construction/start-up. Progress measurement system development, monitoring and management. Reporting. Development of integrated EPCC schedules (Lev.3). Monitoring of Contractor’s performance.

December 2011 – present – Senior Planning Engineer

Project Controls, Senior Planning Engineer, Technip, Oil & Gas

START Date: 
July, 1979
END Date: 
April, 2013

Foster Wheeler, Khabarovsk, Russia                                                                             April 2013 to now

Project Controls

OJ

Senior Planning Engineer, Oil and Gas Company, Highrise building project

START Date: 
February, 2006

Current Role: Senior Planning Engineer for client organisation

also P6 Database adminitrator

Senior Planning Engineer, Ultratech Cement (Aditya Birla Group), Ultratech Cement Plant Construction

START Date: 
February, 2009
END Date: 
July, 2013

PLANNING ENGINEER & PROJECT SCHEDULING, TRACKING, MONITORING, RECONCILATION & MANAGEMENT 

Senior Planning Engineer, Ultratech Cement (Aditya Birla Group), Ultratech Cement Plant Construction

START Date: 
February, 2009
END Date: 
July, 2013

PLANNING ENGINEER & PROJECT SCHEDULING, TRACKING, MONITORING, RECONCILATION & MANAGEMENT 

Senior Planning Engineer, Hill International, Luxurious Housing Project

START Date: 
June, 2014
END Date: 
July, 2016
I was working as a planning engineer in mix used project with 8 blocks of residential with 1401 residences and 1block of hotel. Project name is Sea Pearl Ataköy. I controlled work schedules and plans of two phases of the projectwith Primavera P6. Detailed time plans and work schedules were being conducted with main contractor and control company. Estimated project revenue was 2.8 billion dollars from this project. This project has approximately 600000square meters construction area.

Senior Planning Engineer, Petronas, Offshore Pipeline Replacement

START Date: 
May, 2012

Job Scope

Report directly to the Planning and Cost Control Manager and Facilities Manager for EPIC Pipeline Replacement and Platform Rejuvenationoverall planning work scope for Peninsular Malaysia Operation (PMO) and Sabah Operation (SBO).

Senior Planning Engineer, PETRONAS, Ossfhore Pipeline Replacement

START Date: 
May, 2012

Job Scope

Report directly to the Planning and Cost Control Manager and Facilities Manager for EPIC Pipeline Replacement and Platform Rejuvenationoverall planning work scope for Peninsular Malaysia Operation (PMO) and Sabah Operation (SBO).

Senior Planning Engineer, Hindustan Construction Company Ltd.(HCC), Aditya Aluminium Project

START Date: 
September, 2010
END Date: 
June, 2013

Senior Planning Engineer

  • Studying Drawings and prepare the detailing of Items and BOQ’s.

Market Place

Primavera P6 and Microsoft Project books, on-line video training courses and training material available from an internationally recognised publisher. Teach yourself using on-line or book based learning or run your own in-house or public courses.
Syndicate content