Senior Planning Engineer

Senior Planning Engineer, BP, Devenick & Andrew Area Development

START Date: 
July, 2008
END Date: 
June, 2009

Responsible for the generation of Greenfield and Brownfield Master Control Schedules for Category 2 Projects.

SENIOR PLANNING ENGINEER , TECNICAS REUNIDAS, KBR, JGC, LNG Seagas Damietta (Egypt), joint venture of KBR (Kellogg, Brwon & root)-TRSA (Tecnicas Reunidas)-JGC (Japan Gas Company)

START Date: 
May, 2001
END Date: 
February, 2003

EPC planning of the LNG Sea Gas Project Plant of Damietta (Egypt), joint venture of KBR (Kellogg, Brwon & root)-TRSA (Tecnicas Reunidas)-JGC (Japan Gas Company) with an investment budget of 1,2 billion USD under the TKLSP contract terms.

The project specification required the development of design, procurement and contruction phases of a LNG plant, four LNG ship carriers of 150.000 TPM each to be be built in Korea, and two LNG tanks of 150.000 M3 as the LNG storage system.

This EPCC project was a managing joint venture composed by three engineering companies, KBR-

SENIOR PLANNING ENGINEER , TECNICAS RENUDIDAS, KBR, JGC, LNG Seagas Damietta (Egypt), joint venture of KBR (Kellogg, Brwon & root)-TRSA (Tecnicas Reunidas)-JGC (Japan Gas Company)

START Date: 
May, 2001
END Date: 
February, 2003

EPC planning of the LNG Sea Gas Project Plant of Damietta (Egypt), joint venture of KBR (Kellogg, Brwon & root)-TRSA (Tecnicas Reunidas)-JGC (Japan Gas Company) with an investment budget of 1,2 billion USD under the TKLSP contract terms.

The project specification required the development of design, procurement and contruction phases of a LNG plant, four LNG ship carriers of 150.000 TPM each to be be built in Korea, and two LNG tanks of 150.000 M3 as the LNG storage system.

This EPCC project was a managing joint venture composed by three engineering companies, KBR-

Senior planning engineer, HSE Contractors Inc. - Orlando, Multiple

START Date: 
October, 2013
Construction management consultant for multiple projects in the us and provides primavera trainng

Senior Planning Engineer, Babcock Rail, Sheilds to Gourock OHLE Refurbishment

START Date: 
September, 2005
END Date: 
November, 2006
Senior Planning Engineer for all Power, OHL and Civil Works for the division reporting directly to the Divisional Commercial Director.

Senior Planning Engineer, G. P. Zachariades (Overseas) Ltd, Bahrain, Refurbishment of Regency Intercontinental Hotel, Manama, Bahrain

START Date: 
June, 2010
END Date: 
September, 2011

·         Using Primavera P6, prepared construction schedules using tender plans, monitored and recorded the project progress and prepared monthly, weekly look-ahead programs.

·         Prepared schedule of quantities of various materials, material tracking system, cash flow-S curve and monthly progress reports; identified critical paths and activities.

Project:

·         Refurbishment of Intercontinental Regency Hotel, Manama, Bahrain - $ US 12 million.

Senior Planning Engineer, NG Bailey, Class One Nuclear

START Date: 
January, 2011

As Main Contractor on an NEC3 Option C contract, NGB are working alongside BAM Nuttel in order to deliver a large Class One nuclear establishment. Following the successful tendering of the project, Matthew’s role as Senior Planning Engineer has been to build and subsequently manage the 2000+ activity schedule using Primavera P6.

Senior Planning Engineer, outotec, Green Anode Plant & Butts Crushing

START Date: 
February, 2013
  1. Project Planning, Monitoring and Reporting for Green Anode Plant & Butts Crushing Plant for Alumina Smelters
  2. Monitoring of Various Discipline works including Mechanical Equipments, Piping, Electrical Works, Civil & Structural Steel, Fire Fighting & HVAC Works and liaising Coordination among all
  3.  Coordinating with Subcontractors for Daily Progress Monitoring
  4. Preparation of Forecast Schedule for Pre-Operational Verification and Commissioning Activities for final handing over
  5. Delay analysis and trouble shooting on Weekly basis and timely al

Senior Planning Engineer, Cleopatra for Touristic Investment, Touristic Resorts and Adminstration Buildings

START Date: 
August, 1997
END Date: 
January, 2012

-Preparing post and pre tender projects baseline including Work Break Down Structure, estimating time duration and allocating resouces.

-Monitoring and updating work progress using Earned Value Management system, suggesting for corrective actions when needed.

-Preparing various resouces S-curves and comparing actual verses planned.

-Get involved in Claims and Change Management during project Life Cycle.

-Using relevant softwares, P3, P6, Sure Track, Primavera Contract Manager and MicroSoft Office Package.

Senior Planning Engineer, Byzak, Airdrie Transfer Sewer

START Date: 
December, 2010
END Date: 
September, 2011

Working as a contract Planning Engineer responsible to the Commercial Director and Delivery Managers for a number of Scottish Water infrastructure projects at various capex stages.