Guild of Project Controls: Compendium | Roles | Assessment | Certifications | Membership

Primavera

Site planning enginner, Eversendai Engineering Saudi, Cemestero Saudi arabia co, KAFD Riyadh, Saudi arabia

START Date: 
August, 2011
END Date: 
December, 2013
 Assisted the project managers in identifying the right resources for a project team, tracking resource allocation and resource usage to minimize, over and underutilization.  Identified & built project teams by using resources that belong to the Enterprise Resource Pool.  Performed in-depth reporting & analysis against completed projects, in-progress projects & resource availability.  Responsible for planning Day to Day erection Activity and Allocate resource accordingly.  Coordinated with Client, Designer, Subcontractors, Quantity Estimation, Preparing Monthly Payment & Control in Do

Project Planner / Scheduler, Daewoo E&C, COmbined Cycle Power Plant

START Date: 
July, 2008

Planner / Scheduler

·         Understanding the Contract Scope of Work / Supply / Delivery / Execution.

·         Plan the projects form the Engineering stage to Supply and Construction as per the contract agreement.

·         Developing an Overall Master Time Schedule for the project (Tender submission / Awarded Projects).

Planning Engineer, Descon Engineering Limited Pakistan, BYCO oil refinery

START Date: 
December, 2008
END Date: 
December, 2012
  • Preparation of Execution level-3 & level-4 plans on Primavera Project Planner, Indirect and direct manpower deployments.
  • Monitor progress of piping to ensure that the project is progressing as planned and the targets would be met and raise flags if the targets are likely to slip.

Senior Planning Engineer, Petronas, Offshore Pipeline Replacement

START Date: 
May, 2012

Job Scope

Report directly to the Planning and Cost Control Manager and Facilities Manager for EPIC Pipeline Replacement and Platform Rejuvenationoverall planning work scope for Peninsular Malaysia Operation (PMO) and Sabah Operation (SBO).

Senior Planning Engineer, PETRONAS, Ossfhore Pipeline Replacement

START Date: 
May, 2012

Job Scope

Report directly to the Planning and Cost Control Manager and Facilities Manager for EPIC Pipeline Replacement and Platform Rejuvenationoverall planning work scope for Peninsular Malaysia Operation (PMO) and Sabah Operation (SBO).

P6 Planners, Doosan Babcock, All projects

START Date: 
September, 1978

Currently a pipefitter with Doosan Babcock, working at Sellafield. Looking to get in to planning as I have Primavera P6 Planning and Project Management.

Application Engineer / Planner / Primavera Application / Trainer, Toshiba Corporation, 800 MW NTPC PROJECT

START Date: 
September, 2009

3 years experience in Proposals & Projects.

Recently for the past 1 year into Project Planning & Scheduling - 800 MW Thermal Power Projects (NTPC)

Planning/Project Engineer, CMC Engineering, LRT Extension Project

START Date: 
September, 2012
Work Profile Develop and maintain the WBS and project schedule of the principle phases, project activities, events, durations, sequencing, detailing key activities and milestone events, constraints and influencing factors affecting the project schedule. Provide the team with an integrated, comprehensive management tool providing critical path method scheduling. Undertake planning scheduling studies (analysis) including identification of potential and delay activities and impacts of critical components of the project.

Planning Manager, M+W Group, TATA consulting Engineers, P & G Hyderabad, Michelin Tyres, Areva T & D, Toshiba JSW

START Date: 
June, 2008

Michelin Tyre Factory, Phase 02 – EPC, Chennai:

Project Scheduler, Responsible for the Planning and scheduling of the EPC Project (75,000 Sqm). Performed key functions like Master Construction Schedule, L4 Schedule, Resource Planning, Site Planning, Procurement Matrix, Design Schedule, Client Interface Schedule, Vendor finalization support, Project Budget formulation, S Curves (Financial & Progress) Vendor Bill Certification Report.

 

Michelin Tyre Factory, Phase 02 – Design & Engineering, Chennai:

Market Place

Primavera P6 and Microsoft Project books, on-line video training courses and training material available from an internationally recognised publisher. Teach yourself using on-line or book based learning or run your own in-house or public courses.
Syndicate content