Planning and Project Control Chief Engineer, Snamprojetti and Persian Gulf Oil Company Consortium, Persian Gulf Oil Refinery

START Date: 
February, 2008
END Date: 
November, 2011

 

  • Scope definition of project in a EPC contract as a master scheduler
  • Consult with PM to bring fall behind project back on track
  • CPM scheduling, resource leveling, EV, SP, CP, TCPI, VAC and ETC calculation
  • Development of project planning and monitoring procedures and systems
  • Involve in project management office process and coordination
  • Project prediction based on analyze schedule progress and performance
  • Engineering and Construction coordinator
  • Associate with change order evaluations team and analyze r

Site Planning and Project Control Engineer, Foster Wheeler, GS, OIEC COnsortium, South Pars Gas Field, Phases 9 & 10

START Date: 
April, 2004
END Date: 
January, 2008
  • Site scheduler and project controller
  • Work with construction crew in order to prepare work front and look ahead plan
  • Assist with scheduling team to estimate and calculate activities duration and physical progress
  • Accomplishment as a qualified planner to reduce disordering between sub-contractors
  • Assist with PMO in fast tracking plans, catch up plans  preparation
  • Data gathering from construction team to prepare project progress reports
  • Update and Progress data bank to monitor the EPC versus baseline through S-curves

Planning and Cost Control Engineer, METIS CONSTRUCTION AND TRADE CO., Roads & Infrastructure Projects

START Date: 
June, 2006
END Date: 
April, 2007

·         Planning and Cost Control Engineer for Industrial Projects in Libya

I prepared and monitored; Work Programs for Railroad Bridge, Dam, Pump Station, and Pipeline projects in coordination with sites. Furthermore I studied cash flow and financial standing of the projects in cooperation with the finance department and periodically reported the work to the head management of the company.

 

Project Planner, Amrec Pty Ltd, stationed at Chevron, Civil, Crude Segregation, E&I and chemical scope e.g. Tank Programme, Field Projects, Various refnery projects which includes mechanical

START Date: 
February, 2007
  • Chevron Refinery, Cape Town

 

  • Executing the planning and scheduling strategy for Projects in support of the Client’s planning and scheduling strategy.
  • Validation of vendor and contractor schedules.

Planning In-charge, Feedback Ventures Pvt. Ltd., National Highway

START Date: 
May, 2003
END Date: 
April, 2011

 

  • EXPERIENCE (7+ years)

M/s. FEEDBACK VENTURES PVT. LTD. (APRIL-2010 TO TILL DATE)

www.feedbackventures.com

Project Controls Manager / Planner / Scheduler, Jacobs Engineering, URS Corp, Saylor Consulting, Airports, courthouses, jails, convention centers, hospitals, waste water plants, sewer systems, multi family

START Date: 
March, 1995

Over 30 years in commercial / institutional construction as a General Contractor, Construction Manager, Project Controls Manager, Superintendent and Certified Planner / Scheduler

PLANNING ENGINEER, ILFORD Imaging UK Ltd, Various

START Date: 
October, 1991
END Date: 
August, 2004

Planning Enginner covering such diverse project as a R&D, product development, new warehouse builds and maintenance shutdowns

Planning Engineer, Al Turki Enterprises LLC- OMAN, Central Planning Department & The Wave, Muscat

START Date: 
April, 2010
END Date: 
June, 2010

 

Present Experience in supporting project management team in Planning, coordination & monitoring of several Civil construction projects by developing, monitoring, updating & Controlling an integrated project plan and schedule through Primavera (P6.7) & SAP Project system module. Assisting planning manager in Pre-qualification & technical submission of tenders, SAP implementation and Preparation of MIS reports.
Experience Hours (Planning & Scheduling): 
1400
Experience Hours (Cost Management): 
400
Experience Hours (Forensic Analysis): 
500

Project Planner, BLACK & VEATCH International, 1.Refurbishments[Design, Supply, Installation, Construction, commissioning and testing] Lane End WTW [3 million Pound starlings],2.Refurbishments[Design, Supply, Installation, Construction, commissioning and

START Date: 
June, 2007
END Date: 
December, 2008

Responsibilities discharged   

  • Develop the Schedule, Set up the base line
  • Resource loading, Target setup
  • Coordinate with project team
  • Attain the meeting and follow the guideline and Collect the data from project
  • Monitoring the Sub contractor works and update the Schedule accordingly
  • Update the schedule and analysis the Current float and critical path.
  • Advice the project manager for critical activities and concern cause.
  • Produce Monthly Project Fina