Guild of Project Controls: Compendium | Roles | Assessment | Certifications | Membership

quality control

CAD Coordinator, otaishan consulting engineers, Many

START Date: 
September, 2001
END Date: 
January, 2012

 

Working as a CAD Operator for Otaishan Consulting Engineers in Riyadh - Saudi Arabia, work included Architectural concepts & presentations with (ACAD, Adobe Photoshop & PowerPoint), beside Mechanical, Electrical, Urban Planning & Landscaping Drafting.

And then promoted as CAD Coordinator

PROJECT ENGINEER, Fulton Hogan, Eastern Freeway Extension - Melbourne

START Date: 
January, 2004
END Date: 
May, 2005

Project Engineer

Fulton Hogan

Eastern Freeway Extension

 

  • Autonomous control of multiple areas of project works including RC structures, fabricated steel, drainage, and a wetlands construction.
  • Budgetary control and day to day coordination of works

Trainee Engineer - Quality Control, Kalandi Estate Developer, G+40 storey Twin Tower.

START Date: 
June, 1996
END Date: 
May, 1997

Worked as Quality Control Engineer (Trainee Engineer) reperesenting the Project Owner.

  • Check Steel Reinforcement & Shuttering works
  • Concrete Mix Design for M45 Concrete with 1 hour setting time.
  • Maintaining material register.
  • Concrete strength testing.

SITE ENGINEER, Ramesh and Associates, Asphalt and Concrete roads., Highway Modificiation

START Date: 
December, 2000
END Date: 
January, 2003

Worked as Site Engineer for 

  • Modification of National highway in both Asphalt & Concrete road construction along with infrastructure works.
  • Road widening works of City roads.

Major Roles:

  • Site Coordination
  • Quality control checks
  • Monthly site Bill preparation (Valuation)
  • Resource managment

Deputy Project Manager, Consolidated Contractors Company CCC / SAIPEM-ENI Group (Consortium), Karachaganak Main Works , Power Plant Complex, Temporary Camp and Construction of 13 km Road Projects, Aksai, Kazakhstan

START Date: 
August, 1999
END Date: 
August, 2002

Duties include controlling earthworks and civil concrete activities, introducing and monitoring Russian/Kazakh equipment which were an added values in this new area; supervising buildings’ architectural finishes, all electromechanical systems, wall and roof insulated cladding, steel structure and fireproofing activities; overcoming numerous challenges and difficulties in redesignin

PCM & Senior Schedulers, Urenco/LES, Nuclear Enrichment Facilities

START Date: 
April, 2011

Senior Scheduler/Scheduling all phases of project activity such as engineering, procurement, construction, inspections and processes.

Senior Project Controls Specialist, Vice President Project Management, Inc., Spacemakers, Multiple projects across multiple sectors

START Date: 
June, 1990
END Date: 
June, 1992

Spacemakers, Inc., Vice President Project Management, Construction Manager, Norfolk, Virginia

Experience Hours (Planning & Scheduling): 
1350
Experience Hours (Cost Management): 
1350
Experience Hours (Forensic Analysis): 
1350

Manager of Construction Department, Charlottesville Lumber Company/Better Living, Multiple Projects

START Date: 
May, 1974
END Date: 
August, 1977

Charlottesville Lumber Company/Better Living, Building Contractor, Manager of Construction Department , Charlottesville, Virginia, 

Oversaw all field operations, including layout of work, scheduling of manpower, ordering materials and equipment and scheduling deliveries.  Studied, set up and maintained safety program, working with O.S.H.A inspectors and regulations. Coordinated subcontractors, in-house construction staff, negotiated contracts, took-off and estimated work, wrote scopes of work, provided p

Market Place

Primavera P6 and Microsoft Project books, on-line video training courses and training material available from an internationally recognised publisher. Teach yourself using on-line or book based learning or run your own in-house or public courses.
Syndicate content