Site Lead Planner, TIVENCA, Interconnection of Gas Transport Systems from Mid-Eastern to Western Venezuela (ICO) Phase II

START Date: 
February, 2008
END Date: 
May, 2009

Planning and Control Engineer for Quality Assurance and Quality Control of the Interconnection of Gas Transport Systems from Mid-Eastern to Western Venezuela (ICO) Phase II (EPCC Project) Project with a key role in the development and management of a monitoring program for measurement the efficiency and efficacy  of the project. The main responsibilities included:

Experience Hours (Planning & Scheduling): 
200
Experience Hours (Cost Management): 
200
Experience Hours (Forensic Analysis): 
50

SENIOR Planning & Scheduling Engineer, QStech, POLYSILICON PROJECT

START Date: 
March, 2014
END Date: 
June, 2014

q   Establishing and maintaining the Project WBS

q   Establishing and maintaining the Integrated Project Master Schedule

q   Integrating the Baseline Schedules from all Project stakeholders

q  Issuing and updating the Integrated Control Schedule

q  Progress Monitoring and Measurement

q  Project Progress Measurement (baseline versus actual versus forecast)

Experience Hours (Planning & Scheduling): 
500
Experience Hours (Cost Management): 
0
Experience Hours (Forensic Analysis): 
0

Project Planner, Atkins Rail, Various

START Date: 
November, 1998
END Date: 
January, 2003

Atkins                                                                                                 &

Project Planner, Metronet Atkins Station Design Team, (LUL/Metronet Affiliates Project) London

START Date: 
February, 2003
END Date: 
February, 2005

Metronet (ASDT)                                                                                                &nb

Senior Project Planner, Amec Spie Rail (UK), NwR Signalling Works Geographical Partnering Arrangement framework

START Date: 
March, 2005
END Date: 
March, 2006

Amec Spie Rail (UK) Ltd                                                                                          Senior Planner

Assistant Planning Manager, Metronet Alliance, (LUL/Metronet Affiliates Project) London

START Date: 
March, 2006
END Date: 
January, 2008

Metronet Alliance                                                   Senior Planner / Assistant Planning Manager

Associate Manager, LODHA GROUP MUMBAI, High End Residential Towers

START Date: 
March, 2015
  • Preparing ancillary construction lookahead schedules as required by the Seniors.
Experience Hours (Planning & Scheduling): 
2050

Associate Manager, LODHA GROUP MUMBAI, High End Residential Towers

START Date: 
March, 2015
  • Preparing ancillary construction lookahead schedules as required by the Seniors.
Experience Hours (Planning & Scheduling): 
2050

EPC Project Lead, ABB INC., Kizomba C, SNEPCO BONGA

START Date: 
December, 1999
END Date: 
March, 2007

·       Lead a team of 5 planners, inclusive of subcontractors, and 3 cost engineers.

·       Maintained Integrated Master Project Schedule for the Exxon Kizomba C Project – Topsides and Subsea Systems.  Collaborated with subcontractors for schedule updates and status.

·       Established Work Breakdown Structure and Cost Breakdown Structure for both Scheduling and Cost Reporting.

Experience Hours (Planning & Scheduling): 
14900
Experience Hours (Cost Management): 
14000