scheduling

Project Planning Engineer, Modern Arab Construction Co.- Saudi Arabia, Tanajib Sea Water Expansion Project - Saudi Arabia

START Date: 
October, 2010
END Date: 
December, 2011

1- Preparation of Schedules 2- Updation of Scheduling 3- Preparation of Daily Manpower & Equipment Reports 4- Progress & Status Reports 5- Estimation of Resources 6- Cost Control Reports

Project Planning Engineer, Modern Arab Construction Co.- Saudi Arabia, Tanajib Sea Water Expansion Project - Saudi Arabia

START Date: 
October, 2010
END Date: 
December, 2011

1- Preparation of Schedules 2- Updation of Scheduling 3- Preparation of Daily Manpower & Equipment Reports 4- Progress & Status Reports 5- Estimation of Resources 6- Cost Control Reports

JUNIOR ENGINEER, Habib Rafiq (Pvt) Ltd., Various Projects

START Date: 
July, 2006
END Date: 
December, 2006

Involved in the team responsible for tendering, scheduling, resource coordination and budgeting.

Senior Planner / Planning Manager, Rhead Group, UKCCS Demonstration Competition, London Underground SSL, South Wales Pipeline, EGMP Enhanced Gas Measurement Project

START Date: 
March, 2010

-          National Grid Carbon: UKCCS Demonstration Competition (Carbon Capture and Storage).

-          London Underground SSL Project Tender.

-          Forensic Planning and Delay Analysis (CNI).

-          South Wales Pipeline Project - Reinstatement Works.

-          Siemens plc (Major Projects & Electrification) - Tender Programmes.

PROJECT ENGINEER, PRY TORTOLA AND TORTOLA DESIGN GROUP, Residential Buildings, ROADS AND CULVERTS, SEMI AUTOMATED POULTRY HOUSES (5000 HEADS CAP)

START Date: 
April, 1995
END Date: 
July, 2000
  • Conduct site visit of the proposed project, gather data for the construction of TEMFACIL and check the existing condition of the project site for heavy equipment utilization in clearing and cutting to required slope.
  • Lead in the preparation of Project Plan and Schedule, Bill of  Materials, Scope of Works, Construction Technical Specifications and Project Quality Plan for Design and Build projects.
  • Conduct site visits to subcontractors and suppliers to determine adequacy of plant (for ready mix concrete batching plant), methods of delivery and their reputation

PLANNING ENGINEER / QS, LOCAL GOVERNMENT OF THE PHILIPPINES, GOVERNMENT VARIOUS PROJECTS

START Date: 
August, 2000
END Date: 
June, 2006
  • Preparation of project master schedule.
  • Preparation of the project resource assignment, S-curves and histograms.
  • Review project concerns and ensure follow up actions to close issues.
  • Establish interim milestones and mitigate project critical items
  • Preparation of weekly and monthly progress reports
  • Scheduling & leveling of resources.
  • Progress spotlights and updating of schedules.
  • Provide look aheads, 3 weeks and monthly.
  • Estimating, Costing and budgeting
  • Raise flag for potential impacts on co

CIVIL / PLANNING ENGINEER, ARAMCO-KJO THRU: BHSC, Replacement of Pipe Sleepers in GOSP, Replacement of Oil Tank Foundation and Dikes, Replacement of Machinery Foundation in Power Plants and Flare , Offshore Maintenance Works in Oil Rig / Platform, Minor C

START Date: 
July, 2006
END Date: 
August, 2008
  • Prepare project master schedule and project detailed schedules.
  • Monitoring and Controlling of the integrated schedule of all project activities including Civil, Mechanical and Electrical during the construction phase.
  • Prepare reports on Baseline vs Current Schedules plus analysis on forecast for weekly progress report to the top project management team.
  • Interface with Engineering, Construction and Commissioning activities to align activities according to plan
  • Preparation of float and critical path analysis
  • Issue Project Weekly/Monthly

SENIOR PROJECT CONTROL ENGINEER, CHINA HARBOUR ENGINEERING ARABIA CO. LTD, EPC OF MA'ADEN RAZ AL ZAWR PORT

START Date: 
October, 2008
END Date: 
February, 2011
  • Prepare project master schedule and project detailed schedules.
  • Monitoring and Controlling of the integrated schedule of all project activities including Civil, Mechanical and Electrical during the construction phase.
  • Prepare reports on Baseline vs Current Schedules plus analysis on forecast for weekly progress report to the top project management team.
  • Interface with Engineering, Construction and Commissioning activities to align activities according to plan
  • Preparation of float and critical path analysis
  • Issue Project Weekly/Monthly

Site Planner, Monadelphous Engineering Associates, Brownfield and Greenfield mining construction projects

START Date: 
November, 2007
END Date: 
April, 2008

PROJECT 1: BHP Billiton’s Olympic Dam Site in South Australia on A$40 million Brownfield project of Tails Leach Tank refurbishment under Hydromet area

Site Based role - FIFO
PROJECT 2: Structural, Mechanical and Piping contract value of A$30 million as part of OZmineral's Prominent Hill Gold Mine Greenfield project in South Australia

Site Based role - FIFO
 