Website Upgrade Incoming - we're working on a new look (and speed!) standby while we deliver the project

Lead Planning Engineer

Lead Planning Engineer, Parsons Overseas LTD, Common Seawater Supply Project (CSSP) - Seawater Treatment Facilities FEED

START Date: 
April, 2014
  • April  2014 – Till now

-          Employer:Parsons International – Abu Dhabi – UAE

-          Job title:Lead Planning Engineer

Experience Hours (Planning & Scheduling): 
16500
Experience Hours (Cost Management): 
10000

Lead Planning Engineer, TIC JSV, Construction of new export pipeline facilities, onshore pipeline corridor maintenance and civil engineering

START Date: 
February, 2016

·         Develop Level-4 schedules for pipelines facilities construction

·         Ensure alignment of materials arrival and engineering deliverables

·         Coordinatecritical interface milestones with the Client and subcontractors

Lead Planning Engineer, Naim Engineering Sdn. Bhd., Mass Railway Transit (MRT) for Stations Packages : S2 & S4

START Date: 
May, 2015
1. Implementation, development, execution, and coordination of project planning department functions for KL office and for MRT Packages S2 & S4 with 4 subordinate planners which include a mix of senior planners and planners. 2.

Lead Planning Engineer, MARATHON OIL, Brae A Rig Reactivation

START Date: 
January, 2012
END Date: 
September, 2013
Lead/ Senior Planning Engineer on the Brae Alpha Rig Reactivation Project preparation for decommissioning, (brownfield) • Achieved a fully integrated plan for Marathon combining the scopes for Archer Drilling and Petrofac. This covered the delivery of engineering, procurement, onshore equipment refurbishment, fabrication, offshore piece small destruct, stick build equipment installation, loop checking commissioning. This involved setting work break down structure, reporting structures & formats and integration with the platform schedules.
Experience Hours (Planning & Scheduling): 
12000
Experience Hours (Cost Management): 
10000
Experience Hours (Forensic Analysis): 
10000

Lead Planning Engineer, Marathon , Brae A Rig Reactivation

START Date: 
January, 2012
END Date: 
September, 2013
Lead/ Senior Planning Engineer on the Brae Alpha Rig Reactivation Project preparation for decommissioning, (brownfield) • Achieved a fully integrated plan for Marathon combining the scopes for Archer Drilling and Petrofac. This covered the delivery of engineering, procurement, onshore equipment refurbishment, fabrication, offshore piece small destruct, stick build equipment installation, loop checking commissioning. This involved setting work break down structure, reporting structures & formats and integration with the platform schedules.

Lead Planning Engineer, Malaysia Marine & Heavy Engineering Sdn Bhd, SEADRILL T11/ T10 - Self Erecting Drilling Tender Barge Project

START Date: 
November, 2006
END Date: 
February, 2007

SEADRILL T11/ TIOMAN T10 - Self Erecting Drilling Tender Barge Project – Malaysia ($120M - 8,000MT)

  • Handed over successfully with client acceptance of two (2) units Self-Erecting Drilling Tender Barge.
  • Compiled and turnover every project deliverables and reports to client; final progress report, as-built drawings, and operation & maintenance documentations.
Experience Hours (Planning & Scheduling): 
700
Experience Hours (Cost Management): 
700
Experience Hours (Forensic Analysis): 
700

Lead Planning Engineer, JP Kenny Limited, Gorgon Upstream Facilities

START Date: 
October, 2009
END Date: 
June, 2014

Chevron Gorgon Project Upstream Facilities Team

- Assurance & Management of Change Co-ordinator

 

This role required an experienced Project Controls specialist familiar with the spectrum of the oil and gas industry project controls and execution activities, with a good understanding of technical and execution principles of upstream scopes and schedule and cost management processes.  Key responsibilities were:

 

Experience Hours (Planning & Scheduling): 
8000
Experience Hours (Cost Management): 
1000
Experience Hours (Forensic Analysis): 
500

Lead Planning Engineer, Clough AMEC Joint Ventures, Woodside Brownfields Projects

START Date: 
June, 2006
END Date: 
October, 2009

Mærsk FPSO Ngujima-Yin Fire Repairs - Lead Planning Engineer Providing the following planning support to the project manager and engineering team leader in a time critical environment: • Rapidly develop level 1 options for stakeholder review • Installed & configured client/server Primavera 6.2 installation including MSSQL2005 database back end • Integrate vendor and subcontractor schedules into Maersk master schedule • Provide Monte Carlo schedule risk analysis of options using Pertmaster risk software • Participate in risk assessment workshop to define quantitative & qualitative co

Experience Hours (Planning & Scheduling): 
5000
Experience Hours (Cost Management): 
1000

Lead Planning Engineer, Clough AMEC Joint Ventures, Woodside Brownfields Projects

START Date: 
June, 2006
END Date: 
October, 2009
Mærsk FPSO Ngujima-Yin Fire Repairs - Lead Planning Engineer Providing the following planning support to the project manager and engineering team leader in a time critical environment: • Rapidly develop level 1 options for stakeholder review • Installed & configured client/server Primavera 6.2 installation including MSSQL2005 database back end • Integrate vendor and subcontractor schedules into Maersk master schedule • Provide Monte Carlo schedule risk analysis of options using Pertmaster risk software • Participate in risk assessment workshop to define quantitative & qualitative
Experience Hours (Planning & Scheduling): 
5000
Experience Hours (Cost Management): 
1000

Lead Planning Engineer, Oilserv, UAE, EPC for Summail Gas Processing Facility Client: DNO.EP & Assembly- Design, Manufacture and Supply of Packaged Water Treatment and Disposal Plants- Client: BP,EPC - Bijell-1B EWT Facility Upgrade – MOL. EPC - Bakrman -

START Date: 
December, 2013
All the Projects Clients are in Iraq - BP, DNO, MOL. • Project Baseline Schedule preparation in Primavera 6.• Preparation of S Curve, Histograms, Budget, and Progress measuring system.• Updating of schedule on a weekly basis in Primavera 6.• Coordinating with the engineering crew to deliver the deliverables on time.• Keeping track of project on a daily basis.• Weekly and monthly reporting which includes cost reporting.• Bi weekly cost reporting.• Alerting the construction team of the ob
Experience Hours (Planning & Scheduling): 
3900
Experience Hours (Cost Management): 
1300
Experience Hours (Forensic Analysis): 
550

Market Place

No results found... (try selecting a different content filter)

Syndicate content