START Date: 
                    January, 2012         
         
 
    
            
                      
              END Date: 
                    September, 2013         
         
 
Lead/ Senior Planning Engineer on the Brae Alpha Rig Reactivation Project preparation for decommissioning, (brownfield) 
•	Achieved a fully integrated plan for Marathon combining the scopes for Archer Drilling and Petrofac.
This covered the delivery of engineering, procurement, onshore equipment refurbishment, fabrication, offshore piece small destruct, stick build equipment installation, loop checking commissioning. This involved setting work break down structure, reporting structures & formats and integration with the platform schedules.