Azerbaijan (AS.AZ)

Ramil Ibrahimov

First Name: 
Ramil
Last Name: 
Ibrahimov
Professional Since: 
Dec-2003 (16.0 yrs experience)
Years Experience: 
0

Pre-Commissioning Planning and Project Control Manager, Azerbaijan Methanol Company, Azerbaijan Methanol Project, Baku

START Date: 
December, 2011
END Date: 
November, 2013

Planning And Project Control Manager of Pr-Commissioning and Commissioning team
Provide & Execute Commissioning & Pre-commissioning Schedule Plan , Check  P&ID, Provide schedule plan and monitoring Process Unit, Provide Maintenance Schedule plan (CPM) and monitoring them
www.azmeco.com

Senior Specialist, Scheduling/Planning, "KBR (Kellogg, Brown & Root) Design & Construction", EP-300 UNIT (ETHYLENE-PROPYLENE PLANT) REVAMPING Plant Project

START Date: 
October, 2017
END Date: 
June, 2018

SOCAR-AZERKIMYA PRODUCTION UNION (CLIENT) 

 

 

SOCAR KBR (PMC)

https://kbr.com/

Experience Hours (Planning & Scheduling): 
1450

Project Planning Engineer, USTAY Construction, Polypropylene and High Density Polyethylene Plant Project

START Date: 
December, 2016
END Date: 
September, 2017

USTAY Construction                                                from: 26 December 2016 up to 30 September 2017               

Experience Hours (Planning & Scheduling): 
1450

Project / Planning Engineer, Bos-Shelf.LLC, Chirag Oil Project (COP)

START Date: 
September, 2011
END Date: 
December, 2016

Position: Project Planner Engineer  

Projects involved:

 

·        COP Project Fabrication of Jacket & Piles

·        Participation in Loading of Jacket on STB1 Barge.

·        Major Upgrading works to STB1 and DBA Installation Barges for Saipem

Experience Hours (Planning & Scheduling): 
10100

Senior Planning Engineer, Bos Shelf LLC (Saipem S.A.), West Chirag COP, Maersk H.A. Drilling Rig Upgrade Ph.2 (Quay), Deep Water Gunashli Water Injection Expansion, Shah Deniz Phase II

START Date: 
May, 2012
END Date: 
April, 2017

v  Prepare, maintain and control overall master schedule in level 3 thru interactive planning.

v  Contribute draw the narratives of covering basis of schedule and methodologies.

v  Identify, prepare and issue early project stage deliverables.

v  Prepare, maintain and control integrated lower level progress measurement system.

v  Develop and implement plan versus actual histograms & S-curves.

Experience Hours (Planning & Scheduling): 
3000
Experience Hours (Cost Management): 
1000
Experience Hours (Forensic Analysis): 
7000

Senior Planning Engineer, Bos Shelf LLC (Saipem S.A.), West Chirag COP, Maersk H.A. Drilling Rig Upgrade Ph.2 (Quay), Deep Water Gunashli Water Injection Expansion, Shah Deniz Phase II

START Date: 
May, 2012
END Date: 
April, 2017

v  Prepare, maintain and control overall master schedule in level 3 thru interactive planning.

v  Contribute draw the narratives of covering basis of schedule and methodologies.

v  Identify, prepare and issue early project stage deliverables.

v  Prepare, maintain and control integrated lower level progress measurement system.

v  Develop and implement plan versus actual histograms & S-curves.

Experience Hours (Planning & Scheduling): 
3000
Experience Hours (Cost Management): 
1000
Experience Hours (Forensic Analysis): 
7000

Certification Inspector, McDermott Caspian Contractors, Inc., BP ACG Full Field Development (Fabrication of 4 Integrated Topside Decks)

START Date: 
June, 2002
END Date: 
June, 2005
 Authoritative acting of documenting compliance with requirements of Quality Assurance ManagementProcedures related to Structural/Piping fabrication, including dimensional and weight control, materialtraceability numbers, NDT, welding, welder qualifications, ISO drawings, Site Instructions and offshoredocumentation Monitoring the timely input of DATA onto the special proprietary database (MCCI Project CertificationSystem) and Progress of Certification. Reports generation required in the Project Certification.

Certification Engineer, Technip Maritime Overseas Ltd, BP Gas Exploration (Shah Deniz) Limited / TPG – 500 Jack‐Up Platform Fabrication

START Date: 
June, 2005
END Date: 
March, 2006
 Compilation of the Quality Records Dossier, in accordance with procedure and contract requirements.Maintaining Certification spreadsheets and verification of Hydro Test Packages. Auditing thedocumentation handover package for quality and completeness prior to final approval by operations.Reviewing and acceptance of as-built quality records. Supervision the Certification Clerks, to ensure that all quality records are compiled on an ongoingbasis

Close Out Coordinator, Amec Services Ltd, BP Offshore Engineering & Modifications Services

START Date: 
March, 2006
END Date: 
January, 2012
 Organized technical close out process to ensure that all aspects of the technical closeout activitiesand engineering documentation fully completed, and the associated closeout Dossier assembled, andsigned off within the agreed timeframe, including meeting KPI dates.

Market Place

For 25+ years, APMX has been providing competency based project management training to Fortune 500 companies around the world, applying the principles of project based learning, designed to produce measurable results, generating a favorable “return on training investment”.
See how the TIME - LOCATION - VIEW brings clearness to your work programmes
Primavera P6 and Microsoft Project books, on-line video training courses and training material available from an internationally recognised publisher and PMI accredited REP. Teach yourself using on-line or book based learning or run your own in-house or public PMI accredited courses.
Syndicate content